Bharat Heavy Electricals Limited - Jharkhand
37778426 mgrm0000424 steam and water analysis system for patratu 3x800 mw stps , shs primary rack (with inconel 600 cooler coils) , shs wet panel walkway through enclosed type , shs dry panel , chiller 2x100% redundant min. 5 tr rating (with 25% extra capacity) 1 chiller for u#1 & common chiller for u#2&3 , swas loose supply items as per annexure a , commissioning spares reagents /calibrators/standard solutions as required for commissioning & handing over of system to owner. , consumables other than chemical reagents like ph cell, do sensors etc. , freight charges for complete indigenous scope of supply upto project site , erection supervision & successful commissioning of swas in each unit of power plant (as per sl.no.11 under scope of supply sheet of technical specification) , chemical reagents for 12 months continuous operation of analysers , optional item for ordering price for one line of high pressure & high temp. primary & secondary cooling to be considered along with other instruments as per p&id applicable for the project. , optional item for ordering price for one line of low pressure & low temp. secondary cooling to be considered along with other instruments as per p&id applicable for the project. , conductivity (specific, cation) analyser single channel , conductivity (specific) analyser for hotwell single channel , ph analyser single channel , dissolved oxygen analyser single channel , sodium analyser (multi channel 6 channel including spare channel) , silica analyser (multi channel 5 channel including spare channel) , hydrazine analyser single channel , iron analyser , turbidity analyser , degassed cation conductivity analyser , 06 months deputation period of expert engineer post commissioning of equipment in each unit of power plant , comprehensive annual maintenance contract in each unit of power plant for 03 yrs. post completion of warranty , mandatory spares for shs (ref. annexure b) , mandatory spares for analysers (ref. annexure b)...