South Eastern Railways - Jharkhand

39865713 supply of analog voltmeter 0 40 v, moving coil square panel mounting type, dc, accuracy class: 1.5%, size: 72 sq mm as per is 1248 / 2003 or latest with oem calibration certificate make: ae, muller, zeigler, rishabh, l&t yokins, only [ warranty period: 30 months after the date of delivery ] , dc moving coil ammeter analogue type size 72x72 sq mm, range 0 75 amp, fsd 75 mv, accuracy cl 1.5, along with oem calibration certificate. make ae, muller, zeigler, rishabh, l&t yokins, only [ warranty period: 30 months after the date of delivery ] ...

Bharat Coking Coal Limited - Jharkhand

39768134 bids are invited for digital ammeter suitable for secondary digital ammeter , digital voltmeter , tong tester , analog earth tester , hrc fuse 550v, 4a , hrc fuse 415v, 6a , hrc fuse 415v, 16a total quantity : 295...

South Eastern Railways - Jharkhand

39717156 supply of submersible pump set single phase as per is8034 ( q3 category ) , isi marked 5 star rated submersible pump set single phase, with motor rating 1.5 kw for bore size 100mm 240 v + / 10%, delivery size 32mm, 28 stages, discharge head 40 meter, 0.5 lps with control panel having starter mcb / main switch amm meter, voltmeter and water level indicator similar to model no 1.0hp 25d plano106 hows 1ph 3m of cri or similar in ksb, kirlosker as per gem product id 5116877 70086501977 conforming to is: 9283 latest. [ warranty period: 30 months after the date of delivery ] ...

East Central Railway - Jharkhand

39375443 supply of battery voltmeter ( uba ) , range:0 150v, specification: clw / es / 3 / 0073 and drg. no. clw / es / 3 / sk 1 / 0073 range 0 150 volts [ warranty period: 30 months after the date of delivery ] ...

East Central Railway - Jharkhand

39251555 supply and fitment in dc power supply 50x800 volt 100 miliampere ( i ) digital voltmeter 01 no. ( ii ) digial miliampere dc 01 nos. ( iii ) voltage regulator 01 no. ( iv ) pcv board 01 no. [ warranty period: 30 months after the date of delivery ] => limited...

South Eastern Railways - Jharkhand

39244931 supply of lt panel board with aluminum bus bar of 800 amp, 3 phase and neutral 416 v floor mounted type comprising of 2 number x 800 amp 4 pole microprocessor based trip unit acb ( manual draw out ) with mechanical contact erosion indicator and one number x 630 amp, 4 pole, 416 v change over switch as incoming and two nos x 630 amp, 4pole mccb ( adjustable thermal and adjustable magnetic setting type ) and 2 nos x 250 amp 4 pole mccb ( adjustable thermal and adjustable magnetic setting type ) and 2 nos x 16 amp dp mcb as outgoing including hrc type back up fuses with mccb as per their rating, electronic frequency meter, ef and oc relay, digital voltmeter and ammeter etc. with selector switch, led indication lamp on each incoming and out going circuit fitted in suitable size duly painted crca steel box enclosure. [ warranty period: 30 months after the date of delivery ] ...

Indian Army - Jharkhand

39133541 bids are invited for ord head connection rod , nozzle , filer air complete , bty charging regulator , voltmeter ac moving iron , insulation tape elec coton self adhesive , quick fix total quantity : 36...

Bharat Coking Coal Limited - Jharkhand

39060675 bids are invited for boq1 spr relay coil wef 250 vdc , boq2 breaker trip coil 250 vac 11 kv 630a , boq3 insulator for smfc wef 6 600 a , boq4 timer of delay plus on delay coil voltage 250 vac , boq5 indicating lamp with holder 250 vac 7w , boq6 no volt coil 2mv 2 desh 3 110 vac 11 kv 630a , boq7 solenoid coil 550v , boq8 overload relay with ct 100 a , boq9 earth leakage relay 0 point 1a to 5a , boq10 ammeter0 plush myness 50 asize 5 inch dia , boq11 voltmeter 0 plus myness 400 v size 5 inch dia , boq12 voltmeter 0 plus myness 600 v size 5 inch dia , boq13 wire wound resistance 400 700w size length 5 inch dia 2 point 5 inch total quantity : 66...

East Central Railway - Jharkhand

39027967 supply and fitment of components of 110 dc single phase ac input dc output variac copper transformer winding 01 no., resistance 04 nos., main switch 01 no., metal diode 05 nos, mcb 15 amp 02 nos, voltmeter indicator 01 no, fuse 15 amp 01 no., ampere meter 01 no. [ warranty period: 30 months after the date of delivery ] => limited...

District Collector - Jharkhand

38829255 expression of interest for supply, installation of mathematics & science labs in 100 high schools in bokaro, resister (100hm, 150hm) rheostat multimeter voltmeter ammeter galvanometer potentiometer battery eliminator daniel cell compass magnet prism concave lens. convex lens mirror glass slab pendulum tuning fork wave motion apparatus steam boiler density ball spring balance...

East Central Railway - Jharkhand

38634634 supply of battery voltmeter ( uba ) , range:0 150v, specification: clw / es / 3 / 0073 and drg. no. clw / es / 3 / sk 1 / 0073 range 0 150 volts [ warranty period: 30 months after the date of delivery ] ...

Indian Army - Jharkhand

38536778 bids are invited for acsfp bty 12 v 7 ah , ammeter ac mi 0 100 amps ct ratio 96 mm sq , frequency meter , voltmeter ac moving iron 10 300 v 72 mm sq , ring starter total quantity : 23...

South Eastern Railways - Jharkhand

38439336 supply of open well submersible pump ( mono block ) 11kw / 15hp head 25 30 meter discharge range 30 50 lps rpm 2900 stage 1, phase 3 volts 380 + / , 23% 50hz, make kirloskar / cri or similar with 20 hp star delta starter 3 phase with voltmeter , ammeter, time delay relay etc required accessories. make bch, hevells, l&t or similar. [ warranty period: 12 months after the date of delivery ] => limited...

South Eastern Railways - Jharkhand

38289669 supply of 2 hp submersible pump, single phase with dol starter with voltmeter, ammeter, overload relay, the discharge of pump should be 0.5 m3 / hrs at the head of 247 meters and no. of stages should be 45, discharge pipe dia 32 mm, make: kirloskar, cri, ksb or similar. [ warranty period: 12 months after the date of delivery ] => limited...

South Eastern Railways - Jharkhand

38191435 supply of 2 hp submersible pump, single phase with dol starter with voltmeter, ammeter, overload relay, the discharge of pump should be 0.5 m3 / hrs at the head of 247 meters and no. of stages should be 45, discharge pipe dia 32 mm, make: kirloskar, cri, ksb or similar. [ warranty period: 30 months after the date of delivery ] => limited...

East Central Railway - Jharkhand

37828112 supply of battery voltmeter ( uba ) , range:0 150v, specification: clw / es / 3 / 0073 and drg. no. clw / es / 3 / sk 1 / 0073 range 0 150 volts [ warranty period: 30 months after the date of delivery ] ...

Drinking Water And Sanitation Department - Jharkhand

37695394 supply installation testing and commissioning of pump sets, motor control panel, stabilizer and its allied works at bagodih multi village rural water supply scheme at bagodih ( a ) raw water pumping plant 1.01 supplying all labour tools and tackles for taking out old and damaged vt pump sets from intake well with all accessories , demolition of mounting channel for installation of new vertical turbine pump sets. 1.02 supplying, installation, testing and commissioning of electrically driven vertical turbine pump sets kirloskar / wpil / mather & plate / jyoti having discharge capacity of raw water 90 m3 / h against a total head of 75 meter, in all concern coupled with vertical hollow shaft sq. cage induction motor make ( kirloskar / crompton / jyoti / abb ) , operated on 415 + 10% volts, 50hz, 1460 rpm ( 10% above the capacity of pump ) with sole plate, discharge head, m.s. d.f. column assembly random length of 5 ft, total 60 ft. s.s. line shaft, s.s, socket, spider bearing with rubber cut less bush, cidf sluive valve 1 no, cidf nr valve 1 no, pressure gauge 1 no ets all complete. 1.03 supplying all labour tools and tackles for making pcc foundation 2′x2′x1′ with all materials such as cement , sand, stone chips, foundation bolt etc all complete including fixing of sole plate for installation of new vt pump sets 1.04 providing floor / wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated consisting of: proper distribution 200 amp copper bus bar 4 pole 1 set micro processor base tpn mccb 200 amp l&t / siemens make with earth fault relay for incoming feeder – 1no. mccb 160 amp tp l&t / siemens / bch / schneider make for outgoing feeder 2 nos ( 1no for each pump sets ) , 32a dp mcb for lighting 1 no., suitable size of fully automatic star delta starter l&t / bch / schnider / havells make 2 nos., ( 1no for each pump sets ) 0 500 v voltmeter with selector switch 1 set, ct operated ampere meter ( 0 120a ) with ct 2 sets, phase indicating neon lamp 6nos, s.p.p. 2nos , doing internal wiring with proper gauge of copper wire etc all complete job and testing on load. 1.05 cost towards supplying and laying of 16mm2 x , 3 core pvc insulated and pvc sheathed , 1.1 kv grade unarmored copper cable of reputed make and isi marked doing connection from panel to both motor. jsor dwsd 2021 1.06 cost towards making cable mouth for 16mm2 1.07 cost of doing internal light wiring of pump house with 7 / 18 single core copper wire will all required making short point 1 no, medium point 4 nos, long point 1 no with supplying and fixing 4′x40 watt tube light 3 nos, 25 watt, led flood light with bracket 1 no etc all complete. 1.08 earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 1.09 supplying and laying of 8 swg copper / gi wire for making earthing connection in two from earthing station to panel to motor . 1.10 supplying and fixing 3 ton capacity triple gear chain pulley block with 6 meter lifting chain of reputed make and isi marked. 1.11 supplying 75 kva servo controlled voltage stabilizer suitable for input voltage 280 480 volts, output voltage of 400 volt±1%, 3 ph, 50 hz, with copper wound transformer ( oil cooled ) , unbalanced type, air cooled / oil cooled, three phase, frequency : 50 hz. speed of correction : 35v / second. regulation : + 1% from no load to full load.ambient temperature : 0 to 55 degree centigrade ( designed for indoor / outdoor continuous operation. operation : automatic cum manual, mcb for short circuit & over load protection, high volt low volt indicator & volt meter with all necessary switches and indicator the stabilizer shall function satisfactory even if incoming supply is unbalanced between phases within range of 10%. the stabilizer should be constructed in cubical box with bidirectional wheels for easy handling, necessary monitors and user’s controls on front panel such as indication, alarm, volt meter and selector switch for measuring input and output voltage, auto / manual selector switch, raise / low push button etc. suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. all three phases shall independently monitored and corrected. make – powerline / servokon 1.12 supplying and fitting 200 amp changeover switch. make – havell’s / hpl 1.13 supplying and filling transformer oil. 1.14 supplying and laying 120 sq. mm x 3.5 core pvc sheathed & pvc insulated, 1.1 kv grade aluminum unarmoured cable. make – polycab / kei / universal / isi 1.15 cost for supplying and laying delivery pipe line with s / f of 4dia heavy duty gi pipe 5, flange 5nos., rubber insertion 5kg, nut bolt 8kg, with cutting of pipe in required size and welding with all labour tools and tackles. ( b ) clear water pumping plant 1.16 supplying all labour tools and tackles for taking out old and damaged c / f pump set with all accessories , demolition of foundation for installation of new hsc centrifugal pump sets. 1.18 supplying, installation, testing and commissioning of electrically driven horizontal split casing centrifugal pump set make ( kirloskar / wpil / mather & plate / jyoti ) having discharge capacity of clear water 90 m3 / h against total head of 30 meter coupled with tefc sq. cage induction motor make ( kriloskar / crompton / jyoti / abb ) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with cidf sluice valve 1 no, cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tyre coupling 1 set etc all complete. 1.19 supplying all labour tools and tackles for making pcc foundtiaon 1nos, of size 6′x3x3′ with all materials such as cement , sand, stone chips, foundation bolt 6nos etc all complete and plastering and punning over exposed surface. 1.20 cost for supply and laying of suction pipe line with s / f of 6 dia heavy duty g.i. pipe 6m, bend 2 nos., flange 6 nos., nut, bolt, washer 10kg, rubber insertion etc, cutting of pipe in required size and doing complete welding work including all labour, tools, tackle and technician charges.with cp & ohc. ( rate after deducting the scrap materials. ) 1.21 providing floor / wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – proper distribution 100 amp copper bus bar 4 pole 1 set micro processor base tpn mccb 100 amp l&t / siemens make with earth fault relay for incoming feeder – 1no. mccb 63 amp tp l&t / siemens make for outgoing feeder 2 nos. ( 1no for each pump sets ) suitable size of fully automatic star delta starter l & t / bch / schnider make 2 nos. 0 500 v voltmeter with selector switch 2nos ct operated ampere meter 0 100a ) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wire etc all complete job and testing on load. 1.22 cost towards supplying and laying of 10 mm2 , 3 core pvc insulated and pvc sheathed, 1.1 kv grade unarmered copper cable of reputed make and isi marked for doing connection from panel to motor. jsor dwsd 2021 1.23 cost towards making cable mouth for 10mm2 1.24 cost of doing internal light wiring of pump house with 7 / 18 single core copper wire will all required making short point 1 no, medium point 4 nos, long point 1 no with supplying and fixing 4′x40 watt tube light 3 nos, 25 watt, led flood light with bracket 1 no etc all complete. 1.25 cost for doing chemical earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 1.26 supplying and laying of 8 swg copper / gi wire for making earthing connection in to from earthing station to panel to motor . 1.27 cost for supplying and laying delivery pipe line with s / f of 4dia heavy duty gi pipe 5, flange 5nos., rubber insertion 5kg, nut bolt 8kg, with cutting of pipe in required size and welding with all labour tools and tackles. 2 supply, installation, testing and commissioning of 1no v.t. pump set at raw water pumping plant and 1 no h.s.c. pump set at clear water pumping plant and its allied works at rural water supply scheme, dumri ( a ) raw water pumping plant, dumri 2.01 supplying all labour tools and tackles for taking out old and damaged vt pump sets from intake well with all accessories , demolition of mounting channel for installation of new vertical turbine pump sets. 2.02 cost towards supplying, installation and commissioning of vertical turbine water lubricated single / multi stage pump set of kirlosker / jyoti / mather & platt / wpil make capable of discharge 36.55 lps against total head 36 m, with suitable discharge head base plate and accessories such as m.s. column pipe of suitable dia, flange type 40ft ( 5ft length 7nos and 2.5ft 2nos ) , line shaft , spider bearing with rubber cutless bush for 40ft column assembly, coupled with suitable capacity vertical hollow shaft squirrel cage tefc induction motor of kirlosker / jyoti / cgl / abb / bhel make , operated on 415±10% volt , 3 phase, 50 c / s, a.c. supply having 1450 rpm , with non reversible rachet, including cost of supplying fitting and fixing of all required accessories such as strainer, sluice valve, n.r. valve, pressure gauge etc all complete. 2.03 cost for supply and fitting of ml3 starter of l&t make. 2.04 cost for breaking of old pcc foundation and making new pcc foundation size ( 600mm x 600mm x 400mm ) with supply and fitting of 5 / 8 inch dia x 300mm long foundation bolt 4nos, stone chips, sand, cement etc and plastering and punning of exposed surface etc all complete 2.05 cost for supplying and laying of 3core 10 sq. mm, copper cable unarmoured, p.v.c insulated and p.v.c. sheathed 1100 v grade with isi mark from motor to starter in 2 length each for both motor. 2.06 cost for doing socketing of 3 core 10 sqmm cable, with supplyu and fiotting of copper lugs with all required insulating materials. 2.07 supplying 50 kva servo controlled voltage stabilizer suitable for input voltage 280 480 volts, output voltage of 400 volt±1%, 3 ph, 50 hz, with copper wound transformer ( oil cooled ) , unbalanced type, oil cooled, three phase, frequency : 50 hz. speed of correction : 35v / second. regulation : + 1% from no load to full load.ambient temperature : 0 to 55 degree centigrade ( designed for indoor / outdoor continuous operation. operation : automatic cum manual, mcb for short circuit & over load protection, high volt low volt indicator & volt meter with all necessary switches and indicator the stabilizer shall function satisfactory even if incoming supply is unbalanced between phases within range of 10%. the stabilizer should be constructed in cubical box with bidirectional wheels for easy handling, necessary monitors and user’s controls on front panel such as indication, alarm, volt meter and selector switch for measuring input and output voltage, auto / manual selector switch, raise / low push button etc. suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. all three phases shall independently monitored and corrected. make – powerline / servokon 2.08 supplying and fitting 200 amp changeover switch. make – havell’s / hpl 2.09 supplying and filling transformer oil. 2.10 supplying and laying 70 sq. mm x 3.5 core pvc sheathed & pvc insulated, 1.1 kv grade aluminium unarmoured cable. make – polycab / kei / universal / isi 2.11 cost of doing internal light wiring of pump house with 7 / 20 single core copper wire will all required making short point 1 no, medium point 4 nos, long point 1 no with supplying and fixing 4′x40 watt tube light 3 nos, 25 watt, led flood light with bracket 1 no etc all complete. 2.12 supplyng and fitting of 150 mm dia cidf sluice valve with nut bolts washer insersation rubber with all labour tool, tackles and technician charges etc. all complete job ( b ) clear water pumping plant, dumri 2.13 cost towards supplying of hsc c / f pump capable for discharging 36 lps against total head 45 m ( make: kirloskar / crompton greese / jyoti / mather & platt / wpil ) coupled with sutibale size of squirell cage 3 phase induction motor ( make: kirloskar / crompton greaves / jyoti / abb / bhel ) operated on 415v, 50c / s, 1450rpm fitted on common channel fabricated base plate with required size of heavy duty , sluice valve 1no., n.r. valve 1no, pressure guage 1no., etc all complete. 2.14 cost towards dismantling of old 25hp c / f pump motor from base plate by gas cutter, cost for breaking of old existing foundation and removing of all garbage from pump house with all labour tools, tackles and technician cost. making new pcc foundation for above centrifugal pump set of casting of new pcc foundation of size 5 x 3 x 3 deep with s / f of 5 / 8 x 3 long foundation bolt 6nos, cement, sand, stone chips and plastering and punning of exposed surface etc all complete. 2.15 cost for supplying and laying of 3core 10 sq. mm, copper cable unarmoured, p.v.c insulated and p.v.c. sheathed 1100 v grade with isi mark from motor to starter in 2 length each for both motor. 2.16 cost for making and fitting of 6 dia common header with s / f of 6dia heavy duty gi pipe 6mtr, 6dia bend 2nos, 6 dia flange 10nos, rubber insertion 15kg. nut+bolt+washer 16kg, cutting of pipe in require length and duing complete welding etc all complete with all labour tools and tackles. 2.17 cost towards consumable materials such as grease, gland packing, insertion rubber, nut bolt, jute, logbook, , led bulb, broom etc. 2.18 cost for doing socketing of 3 core 10 sqmm cable, with supplyu and fiotting of copper lugs with all required insulating materials. 2.19 supplying 50 kva servo controlled voltage stabilizer suitable for input voltage 280 480 volts, output voltage of 400 volt±1%, 3 ph, 50 hz, with copper wound transformer ( oil cooled ) , unbalanced type, air cooled / oil cooled, three phase, frequency : 50 hz. speed of correction : 35v / second. regulation : + 1% from no load to full load.ambient temperature : 0 to 55 degree centigrade ( designed for indoor / outdoor continuous operation. operation : automatic cum manual, mcb for short circuit & over load protection, high volt low volt indicator & volt meter with all necessary switches and indicator the stabilizer shall function satisfactory even if incoming supply is unbalanced between phases within range of 10%. the stabilizer should be constructed in cubical box with bidirectional wheels for easy handling, necessary monitors and user’s controls on front panel such as indication, alarm, volt meter and selector switch for measuring input and output voltage, auto / manual selector switch, raise / low push button etc. suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. all three phases shall independently monitored and corrected. make – powerline / servokon 2.20 supplying and fitting 200 amp changeover switch. make – havell’s / hpl 2.21 supplying and filling transformer oil. 2.22 supplying and laying 70 sq. mm x 3.5 core pvc sheathed & pvc insulated, 1.1 kv grade aluminium unarmoured cable. make – polycab / kei / universal / isi 2.23 cost of doing internal light wiring of pump house with 7 / 20 single core copper wire will all required making short point 1 no, medium point 4 nos, long point 1 no with supplying and fixing 4′x40 watt tube light 3 nos, 25 watt, led flood light with bracket 1 no etc all complete. 2.24 supplyng and fitting of 300 mm dia cidf sluice valve with nut bolts washer insersation rubber with all labour tool, tackles and technician charges etc. all complete job 2.25 cost towards supplying of hsc c / f pump capable for discharging 36 lps against total head 45 m ( make: kirloskar / crompton greese / jyoti / mather & platt / wpil ) coupled with sutibale size of squirell cage 3 phase induction motor ( make: kirloskar / crompton greaves / jyoti / abb / bhel ) operated on 415v, 50c / s, 1450rpm fitted on common channel fabricated base plate with required size of heavy duty , sluice valve 1no., n.r. valve 1no, pressure guage 1no., etc all complete. 3 supply installation testing and commissioning of pump sets, motor control panel, stabilizer and its allied works at bharkatta multi village rural water supply scheme at bharkatta ( a ) raw water pumping plant: 3.01 supplying all labour tools and tackles for taking out old and damaged vt pump sets from intake well with all accessories , demolition of mounting channel for installation of new vertical turbine pump sets. 3.02 supplying, installation, testing and commissioning of electrically driven water lubricated vertical turbine pump sets kirloskar / wpil / mather & plate / jyoti having discharge capacity of raw water 114 m3 / h against a total head of 39 meter, in all concern coupled with vertical hollow shaft sq. cage induction motor make ( kirloskar / crompton / jyoti / abb ) , operated on 415 + 10% volts, 50hz, 1460 rpm ( 10% above the capacity of pump ) with sole plate, discharge head, m.s. d.f. column assembly random length of 5 ft, total 45 ft. s.s. line shaft, s.s, socket, spider bearing with rubber cut less bush, cidf sluice valve 1 no, cidf nr valve 1 no, pressure gauge 1 no ets all complete. 3.03 supplying all labour tools and tackles for braking old pcc and making new pcc foundation 2′x2′x1′ with all materials such as cement , sand, stone chips, foundation bolt etc all complete including fixing of sole plate for installation of new vt pump sets 3.04 providing floor / wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated consisting of: proper distribution 200 amp copper bus bar 4 pole 1 set micro processor base tpn mccb 200 amp l&t / siemens make with earth fault relay for incoming feeder – 1no. mccb 100 amp tp l&t / siemens / bch / schneider make for outgoing feeder 2 nos ( 1no for each pump sets ) , 32a dp mcb for lighting 1 no. suitable size of fully automatic star delta starter l&t / bch / schnider / havells make 2nos. ( 1no for each pump sets ) 0 500 v voltmeter with selector switch 1 set ct operated ampere meter ( 0 120a ) with ct 2 sets, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wire etc all complete job and testing on load. 3.05 cost towards supplying and laying of 16mm2 x , 3 core pvc insulated and pvc sheathed , 1.1 kv grade unarmored copper cable of reputed make and isi marked doing connection from panel to both motor. jsor dwsd 2021 3.06 cost towards making cable mouth for 16mm2 3.07 cost of doing internal light wiring of pump house with 7 / 18 single core copper wire will all required making short point 1 no, medium point 4 nos, long point 1 no with supplying and fixing 4′x40 watt tube light 3 nos, 25 watt, led flood light with bracket 1 no etc all complete. 3.08 earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 3.09 supplying and laying of 8 swg copper / gi wire for making earthing connection in two from earthing station to panel to motor . 3.10 supplying and fixing 3 ton capacity triple gear chain pulley block with 6 meter lifting chain of reputed make and isi marked. 3.11 supplying 50 kva servo controlled voltage stabilizer suitable for input voltage 240 480 volts, output voltage of 400 volt±1%, 3 ph, 50 hz, with copper wound transformer ( oil cooled ) , unbalanced type, oil cooled, three phase, frequency : 50 hz. speed of correction : 35v / second. regulation : + 1% from no load to full load.ambient temperature : 0 to 55 degree centigrade ( designed for indoor / outdoor continuous operation. operation : automatic cum manual, mcb for short circuit & over load protection, high volt low volt indicator & volt meter with all necessary switches and indicator the stabilizer shall function satisfactory even if incoming supply is unbalanced between phases within range of 10%. the stabilizer should be constructed in cubical box with bidirectional wheels for easy handling, necessary monitors and user’s controls on front panel such as indication, alarm, volt meter and selector switch for measuring input and output voltage, auto / manual selector switch, raise / low push button etc. suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. all three phases shall independently monitored and corrected. make – powerline / servokon. 3.12 supplying and laying 50 sq. mm x 3.5 core pvc sheathed & pvc insulated, 1.1 kv grade aluminium unarmoured cable. make – polycab / kei / universal / isi 3.13 supplying and fitting 200 amp changeover switch. make – havell’s / hpl 3.14 supplying and filling transformer oil. 3.15 cost for supplying and laying delivery pipe line with s / f of 4dia heavy duty gi pipe 5, flange 5nos., rubber insertion 5kg, nut bolt 8kg, with cutting of pipe in required size and welding with all labour tools and tackles. 3.16 cost towards supplying and laying of 16mm2 x , 3 core pvc insulated and pvc sheathed , 1.1 kv grade unarmored copper cable of reputed make and isi marked doing connection from panel to both motor. jsor dwsd 2021 ( b ) clear water pumping plant: 3.17 supplying all labour tools and tackles for taking out old and damaged c / f pump set with all accessories , demolition of foundation for installation of new hsc centrifugal pump sets. 3.18 supplying, installation, testing and commissioning of electrically driven horizontal split casing centrifugal pump set make ( kirloskar / wpil / mather & plate / jyoti ) having discharge capacity of clear water 114 m3 / h against total head of 37 meter coupled with tefc sq. cage induction motor make ( kriloskar / crompton / jyoti / abb ) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with cidf sluice valve 1 no, cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tyre coupling 1 set etc all complete. 3.19 supplying all labour tools and tackles forbreaking old pcc and making new pcc foundtiaon 1nos, of size 6′x3x3′ with all materials such as cement , sand, stone chips, foundation bolt 6nos etc all complete and plastering and punning over exposed surface. 3.20 cost for supply and laying of suction pipe line with s / f of 6 or suitable dia heavy duty g.i. pipe 6m, bend 2 nos., flange 6 nos., nut, bolt, washer 10kg, rubber insertion etc, cutting of pipe in required size and doing complete welding work including all labour, tools, tackle and technician charges.with cp & ohc. ( rate after deducting the scrap materials. ) 3.21 providing floor / wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated consisting of: proper distribution 200 amp copper bus bar 4 pole 1 set micro processor base tpn mccb 200 amp l&t / siemens make with earth fault relay for incoming feeder – 1no. mccb 100 amp tp l&t / siemens / bch / schneider make for outgoing feeder 2 nos ( 1no for each pump sets ) , 32a dp mcb for lighting 1 no. suitable size of fully automatic star delta starter l&t / bch / schnider / havells make 2 nos. ( 1no for each pump sets ) 0 500 v voltmeter with selector switch 1 set ct operated ampere meter ( 0 120a ) with ct 2 sets, phase indicating neon lamp 6nos s.p.p. 2nos doing internal wiring with proper gauge of copper wire etc all complete job and testing on load. 3.22 cost towards supplying and laying of 10 mm2 , 3 core pvc insulated and pvc sheathed, 1.1 kv grade unarmered copper cable of reputed make and isi marked for doing connection from panel to motor. jsor dwsd 2021 3.23 cost towards making cable mouth for 10mm2 3.24 cost of doing internal light wiring of pump house with 7 / 20 single core copper wire will all required making short point 1 no, medium point 4 nos, long point 1 no with supplying and fixing 4′x40 watt tube light 3 nos, 25 watt, led flood light with bracket 1 no etc all complete. 3.25 cost for doing chemical earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 3.26 supplying and laying of 8 swg copper / gi wire for making earthing connection in to from earthing station to panel to motor . 3.27 cost for supplying and laying delivery pipe line with s / f of 4dia heavy duty gi pipe 3, flange 5nos., rubber insertion 5kg, nut bolt 8kg, t 01 no. with cutting of pipe in required size and welding with all labour tools and tackles. 3.28 supplying and fitting 200 amp changeover switch. make – havell’s / hpl...

Bharat Coking Coal Limited - Jharkhand

37603178 bids are invited for item1 , item2 , item3 , item4 , item5 , item6 , timer 0.5 10s 22 ovdc ampere meter 400 200 5a voltmeter anl g 0 600 4in thermometer oil temp msrng assembly contactor tc pwr 415v 3p 220v 500a sling web 4m 10ton polyster total quantity : 50...

Drinking Water And Sanitation Department - Jharkhand

37406346 e quotation for seeking firm rates for non schedule items for preparing estimates of annual repair and maintenance of water supply system and sanitation t rinpas, kanke, ranchi under d.w and s mechanical division, ranchi. , cost towards providing all labours tools & techniciansfor dismantling and disconnecting of 40 hp kirloskar make motor and taken out rotor from motor stator cutting removing burnt and damaged coil and after repairing refitting the same etc all complete. , cost towards full rewinding of 40 hp motor stator with supplying of super enameled round copper conductor suitable gauge class f insulating materials making all connection taping, varnishing with dr beck varnish all complete with deducting the cost of taken out scrap materials ( wt. of wire is 18.5kg approx ) . , s / f ball bearing skf make 6312&6309 at de&nde side of 40 hp kirloskar make motor including proper greasing all complete. , cost towards providing all labour tools and tackles for dismantling of 40 hp single stage kirloskar make c / f pump with changing damaged parts such as gm neck ring as per size and sample 2 nos. shaft sleeve 2 nos. shaft sleeve check nut 2 nos. making ci bearing housing as per size and sample 2 nos. supplying and fitting ball wearing skf make 6309 2nos. making supplying and fitting ms gland tightner as per size and sample 2 pair making citric motion of rotating unit assembling on lathe m / c etc all complete , cost towards repairing of 40 hp l&t motor starter by supplying and fitting l&t make 3 core ml 4 power contactor 45 amp. with auxiliary contractor complete set 2nos. supplying and fitting timer type lt 100 1nos., over load relay suitable range 1nos.etc all complete. , cost towards providing all labours tools & technicians for taking out damaged 250amp. tpn hrc fuse type disconnector main switch replacing new disconnector fuse unit with hrc fuse 1 set doing electrical connection and testing on full load after deducting the cost of taken out scrap materials , supplying and fitting 6”dia tyre coupling complete set with nut bolt washer and tyre of reputed make for 40 hp pump set. , cost towards providing all labour tools and tackles for dismantling and taken out damaged nr valve and s / f 4”dia c.i df nr valve heavy duty rating pn 1 isi marked on delivery pipe line with all work including cost of labour charge all complete testing on full load with deducting the cost of scrap materials. , cost towards supplying and laying 50 mm² x 3.5 core aluminium armoured cable from main switch to industrial panel. ( both sets ) . , cost towards supplying and laying 16 mm² x 3 core copper cable from panel to starter and starter to motor in bunch of two. ( both sets ) . , cost towards replacing damaged suction pipe by making supply & fitting 100 mm dia heavy duty m.s. suction pipe 10feet long both and 100 mm dia m.s. flange welding, 100mm dia long bend 1 no with nut bolt rubber insertion etc required for the job. , transportation charge of above p / set from work site to work shop and vice versa including loading and unloading charge. , cost towards dismantling of 100 hp wpil make single stage c / f pump and taking out its rotating unit assembly with changing of damaged parts by new making s / f neck ring as per sample size 2 nos, c.i shaft sleeve as per sample size – 2nos, making s / f shaft sleeve check nut as per sample size – 2 nos , s / fball bearing skf 6309 2 nos and repairing of bearinghousing by welding turning machining as per bearing size 2 nos, c.i gland tightner as per sample size – 2nos including cost of reassembling of rotating unit assembly balancing rotating unit assembly and fitting the pump with supply of grease gland packing oil packing paper with transporting cost of rotating unit from p / plant to workshop and back , cost toward supplying fitting & changing of 100 hp jyoti make motor ball bearing skf 6316 at de side 1 no. and sk 6314 nde 1 no. with grease. , cost towards repairing of 100 hp l & t make f.a.s.d starter with s / f contactor set 2 sets ) , relay unit ( 85 135a ) 1set, timer unit 1 set, making new connection etc all complete. , supplying and fitting 6”dia tyre coupling complete set with nut bolt washer and tyre of reputed make for 100 hp pump set. , cost towards supplying and fitting mccb 630 amp. for bus bar make l&t schneider / bch , cost towards supplying and fitting mccb 250 amp. for bus bar make l&t schneider / bch , cost toward supplying fitting & changing 100mm dia cidf sluice valve ( pn 1 ) 1 set & cidf nr valve ( pn 1 ) 1 no. including fitting charge , cost toward supplying fitting & changing 150 mm dia ci foot valve hiding single leather flat and gun metal seating all complete. , submersible pump sets , cost towards providing all labour tools and technicians for dismantling and taken out 5hp submersible p / set with column pipe for bore well. , cost towards repairing of5 hp submersible pump with s / f norylimpeller as per size and sample, diffuser, s.s. shaft, s.s. coupling, s.s. sleeve, nut, c.i. suction casing, c.i nrv etc. all complete ( 23 stage ) after the deduction of cost of scrape materials. , cost towards for rewinding and repairing of5 hp submersible motor with s / f 1.2 swg round copper winding wire 24 slot, gun metal bush, thrust plate, thrust bearing, diapharm, oil seal, etc with lathe work. all complete. after the deduction of cost of scrape materials. , supplying all material such as 40 mm dia g.i. pipe medium quality 15 ft. long, charcoal salt etc. for making earthing station as per i.e. rule , cost towards replacement of old and damaged underground service line by supplying new overhead line 10 mm² 3core copper wire after the deduction of cost of scrap materials. , supplying and laying ( under and over ground ) 2 dia aqua gold weather proof pvc pipe from bore well to main rising pipe line ( damaged pipe replacement ) make supreme / isi mark ( both sets ) , supplying and laying ground and on wall 10 swg, g.i. wire for doing continuous earthing for all electrical equipments , cost towards s / f and changing of 2”dia upvc column pipe with heavy duty socket ( make supreme / paras ) for both sets. , cost towards replacement of damaged submersible cable by supplying and fitting 4 mm2x 3 core flat submersible cable including cable jointing all complete. after the deduction of cost of scrape materials. , providing all labour, tools tackles& technicians for lowering of 5hp submersible pump set with all accessories in the bore well , cost towards supplying and fitting ( 1 ) 50 mm dia g.m. full way valve – 1 no ( 2 ) 40 mm dia nr valve – 1 no ( 3 ) 40 mm dia g.i. bend ( 4 ) 2” dia m.s. clamp with nut bolt 2 pair after the deduction of cost of scrape , supplying and installation suitable size panel board for 5 hp submersible pump including fixing on wall comprising of following points such as ( 1 ) d.o.l starter 1no. ( 2 ) hrc fuse – 3 no. ( 3 ) voltmeter with selector switch – 1 set ( 4 ) ammeter with selector switch – 1 set ( 5 ) phase indicating neon lamp – 3 nos. etc. all complete after the deduction of cost of scrap materials. , supplying and fitting union 1.5 dia , supplying and fitting elbow 1.5 dia , supplying and fittingtee 1.5 dia , supplying and fitting socket 1.5 dia , supplying and fitting upvc valve 1.5 dia , transportation charge of above p / set from work site to work shop and vice versa including loading and unloading charge....

Department Of Heavy Industry - Jharkhand

37373700 bids are invited for 3x800 mw pvunl patratu tpp tachometer , tongtester dc 4000a , ammeter tong tester , voltmeter , fault locator cable test kit , relay test kit , tan delta test kit , bdv tester for oil , noise level meter , ductor for transformer winding r , dead weight test accuracy class min 0.05 percent , electro pneumatic calibrator accuracy 0.1 percent of full scale , fluidised temp bath 100 600 deg. c, stability plus minus 0.2 percent deg. c , hygrometer , portable voltmeter calibrator , resistance thermometer bridge 0 2000, resolution 0.001, accuracy plus minus 0.005, sensitivity 0.001 percent, amb. temp. 50 deg. c plus minus 0.005 percent of span per 1 deg. c , test reference rtd , digital storage oscilloscope , portable tc thermo couple rtd calibrator simulator open tender enquiry for fqa lab electrical for total quantity : 21...

Jharkhand State Electricity Board - Jharkhand

37000996 annual maintenance work including periodic and preventive maintenance of equipments and testing of grid equipments as per standard operating procedure at 220 / 132 kv grid sub station ramchandrapur ( adp 2 ) for f.y. 2023 24 from 16.05.2023 to 31.03.2024 1 checking & observation (1. clamp, connectors & jumpers/2.air & gas pressure/3.batterries & battery system/4. control & relay panels 5. transformers oil & winding temp, fans, oil level, silica gel etc. 6. oil leakage & equipment noise). highly skilled 1 person, skilled 1 person & unskilled 2 persons. 2 preventive/routine maintenance of grid substation as per schedule provided by engineer incharge a 220 kv bay/132 kv bay nut bolt tightening, adjustment of contacts (male/female) cleaning, greasing, mobilization, & jelly putting in clamp & connectors ,earthing flat, jumpers and other equipments related with insulators, isolators, ct,pt, cb, la, dropping, and panel of a bay b 132 kv half main bus nut bolt tightening, adjustment, cleaning, greasing, mobilization, & jelly putting in clamp & connectors, earthing flat, jumpers and other equipments related with insulators, isolators, pt. c 132 kv transfer bus nut bolt tightening, adjustment, cleaning, greasing, mobilization, & jelly putting in clamp & connectors, earthing flat, jumpers and other equipments related with insulators, isolators, pt. d 220 kv half main bus i&ii ,nut bolt tightening, adjustment, cleaning, greasing, mobilization, & jelly putting in clamp & connectors, earthing flat, jumpers and other equipments related with insulators, isolators, pt. e 220 kv transfer bus nut bolt tightening, adjustment, cleaning, greasing, mobilization, & jelly putting in clamp & connectors, earthing flat, jumpers and other equipments related with insulators, isolators, pt. f transformer nut bolt tightening,cleaning, in clamp & connectors, earthing flat, jumpers, silica gel filling, and other equipments related with transformer body. g sst nut bolt tightening,adjustment, cleaning, clamp & connectors ,earthing flat, jumpers and other equipments related with sst body. h transformer ir value measurement, i transformer bdv measurement, j circuit breaker ir value measurement, k ct[of a bay] ir value measurement, (quarterly basis) l ct ratio test quarterly, knee point, secondary resistance & tanδ & capacitance yearly basis. m la [of a bay] ir value measurement (yearly basis) n pt /cvt[set] ir value measurement (yearly basis) o pt/cvt tanδ & capacitance yearly basis (yearly basis) p measurement & testing of transmision line using fault locator or any other device q measurement & testing of cb and relay using ct injection kit or any other device ( timing test and tanδ & capacitance yearly basis and crm half yearly basis). r measurement & testing of any grid equipment using any kit available in jusnl or grid s thermography vision report of all grid equiopments. 3 maintenance/emergency maintenance of grid substation as per schedule and job provided by engineer incharge a replacement of nut bolts b replacement of jumper (conductor/ strip) c replacement of clamp & connectors/pg/jumper conia d replacement of female contact e replacement of female contact base f replacement of isolator blade g replacement of isolator blade base h replacement of female contact at high level i replacement of isolator blade at high level j replacement of insulators k replacement of 220 kv or 132kv ct/pt junction box including cable terminationn& connection l replacement of 132kv cb pole m replacement of 220 kv cb pole n minor repairing of trasformer meggering with opening of bushing connectors , checking of prv, vent pipe & buchholz relay, oil top up etc….. including all or any. o minor repairing of ct meggering,opening top cover, replacement of gasket & ct stud , oil topup etc..including all or any p minor repairing of pt meggering,opening top cover, replacement of gasket & pt stud , oil top up etc..including all or any q minor repairing of cb meggering,gas filling, checking of mcb, contactors, motor, spring and tripping or closing coils, sf6 gas filling etc… including all or any. r minor repairing of isolator adjustment of contacts & moving part etc… s minor repairing of panel looping & wiring of cabels, loose contact rectification, replacement of lugs,ferrules etc… t filling of sf6 gas u fixing and replacement of earthing copper bond/flat v fixing and replacement of energy meter/ mw meter/ voltmeter/ ammeter/ relay 4 misc work of grid substation as per schedule and job provided by engineer incharge a battery system cleaning b cleaning of panels( including all 132kv panel, 220 kv panel ,acdb, dcdb,etc) c rectification of lighting and auxiliary power supply in grid premises & colony d material/ equipment manual shifting & movement in grid premises e measurement of earth footing resistance of all earth pits. f laying of control cable 5 break down maintenance a mobilization/demobilization of labour gang b supply of emergency gang with t&p for work like conductor snapping of main bus 6 supply of hydra / crane(upto 8mt capacity ) as per requirement 7 complete overhauling with painting of 150 mva transformer cooling fans with supply of all materials if required 8 transportation of materilas & equipments through truck/pickup upto 3mt including loading,unloading of the materials (i)upto first 50km (ii)50km

Drinking Water And Sanitation Department - Jharkhand

36990274 for supplying, installation, testing and commissioning of 2 set of new 175 hp vt pump sets, motor control panel and its allied work at raw water pumping plant , multi panchayat rural water supply scheme madhuban pirtand , v.t. pump set: , supplying, installation, testing and commissioning of water lubricated vertical turbine pump [ make: kirloskar / mather & platt / jyoti / wpil ] capable of discharging 45 lps raw water against a total head of 185 meter at speed not more than 1500 rpm as per is: 1710 / 1989 with column length not less than 50 ft in 5ft eachwith closed type ss impeller, ss line shaft, ss shaft sleeves, flanged type ms column pipes suitable for below the floor installation and existing delivery header coupled with verticalhollow shaft operated on 415v±10%, 3 phase, ac, 50±5%hz, 4 pole, duty s1, insulation f, lt squirrel cage induction motor with suitable size of coupling as per latest is specification [ make: abb / bhel / crompton / marathon / jyoti / kirloskar ] having 10% more bhp than the pump, making alignment, making electrical connections, with all required tools, tackles, consumables as required, testing and commissioning on full load as per the direction of e / i. etc all complete. , cost towards dismantling, lifting of old 175 hp pump sets with all 200 mm dia column pipes from intake well and loweringnew pump sets with all accessories along with all labour tools and tackles etc all complete. , cost towards breaking of old pcc foundation and removing of all garbage from pump house to out side with lead of 300 m with all labour tools and tackles etc all complete. , cost towards making of newpccfoundation sizing 3 x 3 x 1 with supplying and fitting of foundation bolt 4nos., cement, sand , stone chips, as required and plastering and punnning over exposed surface etc with materials, all labour tools and tackles etc all complete. , cost towards supply and laying of 3c x 95 sq. mm copper cable, pvc insulated & pvc sheathed, 1100v grade, isi marked, make.havells / polycab / finolex / gemscab / any reputed make for 3 pump sets , socketing of terminal ends with s / f of terminal socket including all labour , tools and tackles. 3 core x 95mm2, copper cable 12 ends. , cost towards supplying and fixing 5 ton capacity, triple spur gear type chain pulley block suitable for capacity as below with 6 meter lift complete with load chain and hand chain suitable for above lift , tested to 50% over load as per is 3832 carryingisi mark with travelling trolley etc. , providing floor mounted cubical l.tmotor control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – ( a ) incoming: ( i ) proper distribution 800 amp copper bus bar 4 pole 1 set ( ii ) mccb 800 amp. acb, make l&t / siemens for incoming feeder 1no. ( iii ) 0 500 v voltmeter 1no. with selector switch 1 no, ct operated ampere meter ( 0 500a ) 1no. selector switch 1 no, phase indicating neon lamp 3 nos. ( b ) outgoing: ( i ) mccb 630 amp. tpn type, make l&t / siemens for outgoing feeder 3 nos. ( 01 no for each pump set ) ( ii ) suitable size of fasd starter l&t / bch / schneider make 3 nos. ( iii ) 0 500 v voltmeter 3nos. with selector switch 3 nos, ct operated ampere meter ( 0 500a ) 3nos. selector switch 3 nos, phase indicating neon lamp 9 nos, single phase preventor 3 nos., doing internal wiring with proper gauge of copper wire etc all complete job with testing on full load....

Drinking Water And Sanitation Department - Jharkhand

36990263 renovation with supply installation testing and commissioning of pump set, overhauling of motor control panel and its allied work at rural water supply scheme, chirkunda kumardhubi, maithan ( old scheme ) , raw water pumping plant: , cost towards supplying, installation, testing and commissioning of electrically drivenhorizontal split casing centrifugalpump set make ( kirloskar / wpil / mather & plate / jyoti ) coupled with tefc sq. cage induction motor make ( kirloskar / crompton / jyoti / abb ) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with suitable size of cidf sluice valve 1 no, cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tyre coupling 1 no etc all complete.head 50 mdischarge 275 m3 / h ( hp 100 approx ) , supplying all labour tools and tackles for taking out old and damaged c / f pump set with all accessories , demolition of foundationfor installation of new hsc centrifugal pump sets. , supplying all labour tools and tackles for making new pcc foundtiaon of size 6 x 3 x 3 with all materials such as cement , sand, stone chips, foundation bolt 6nos etc all complete and plastering and punning over exposed surface with all labour, tools, tackle and technician charges. , cost towards supply and laying of suction pipe line with s / f of 10 dia g.i. pipe 2 meter, 10 dia g.i. bend 1 no., 10dia g.i. flange 4nos., rubber insertion 10kg, nut, bolt & washer 10kg etc and cutting of pipe in required size and doing complete welding work including all labour, tools, tackle and technician charges.with cp & ohc. ( rate after deducting the scrap materials. ) , cost towards supply and laying of 8dia delivery line with s / f of8 dia heavy duty g.i. pipe 1 meter, 8dia g.i. flange 4nos., rubber insertion 10kg, nut, bolt & washer 10kg etc and cutting of pipe in required size and doing complete welding work including all labour, tools, tackle and technician charges.with cp & ohc. ( rate after deducting the scrap materials. ) , cost towards overhauling of motor control panelwith all labour tool, tackles and technician charges for disconnecting the electric line & opening of electric wireconnection inside panel. cleaning, checking, rectifying of faults with supply and fitting of damaged spares such as bus bar 1set, ampere meter 1no., voltmeter 1no., indicating lamps 3 no. etc, dressingof motor cables with new lugs, crimping works etc all complete and testing on full load. ( rate after deducting the cost of scrap materials ) . , cost towards overhauling of f.a.s.d. starter panelwith all labour tool, tackles and technician charges for disconnecting the electric line & opening of electric wireconnection inside panel. cleaning, checking, rectifying of faults with supply and fitting of contacter set ( ml 4 1no and ml 6 1no. ) l&t make or equivalent capacity of isi marked reputed make, over load relay 1no., timer 1no., spp 1no. etc all complete work, dressingand doing fresh electric connection with new wire and connector inside panel, rechecking of all connections and testing on full load. ( rate after deducting the cost of scrap materials ) . , cost towards supplying and fitting of 30w led flood light, with bracket, copper wire, on off switch etc with all accessories including all labour tools , tackles and technician charges., with cp & ohc, ( rate after deducting the scrap materials. ) . make havells / syska / mescab / polycab / phillips , providing chipping work on the roof surface of raw water pump house, removing of all garbage to outside with lead of 50 m , providing and cleaning of concrete surface to remove dust and cement laitance by cleaning with compressed air & water jet including all materials, labour, tools complete. ponding test to be done after plugging all outlets and to be checked from soffit to identify seepage, leakage. on identification of seepage, cement grouting to be done with non shrink expanding admixture of sika lndia pvt.ltd. / myk schomberg / dr fixit / fosroc or equivalent. [ size 12.5 m x 6.7 m = 83.75 m2 ] , cost towards providing pcc m 200 in nominal mix of 1:1.5:3on roof with approved quality of stone chips 12mm to 6mm size graded andclean course sand of fm 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete as per building specification and direction of e / i. [ jsor bcd 2018 5.3.2.1 ] [ size 12.5 m x 6.7 m x 0.05 m= 4.19 m3 ] , providing 12 mm thick water proof cement plaster ( 1:3 ) with clean coarse sand of f m. 1.5 with integral water proofing compound liquid @125 ml per bag cement including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of e / i.brand fosroc conplast x421 lc, sika plastocrate plus, dr fixit pidiproof lw+, myk proof wp 10 or equivalent. [ size 12.5 m x 6.7 m = 83.75 m2 ] , dismantling old plaster and pointing in cement or lime and taking out joints to 15mm. depth, watering and disposal of unserviceable materials with all leads all complete as per direction of e / i. inside and outside of pump house, approx=310 m2 , providing 6mm thick cement plaster ( 1:4 ) in ceiling and wall of building with clean coarse sand of f.m. 15 including screening, curingwith all leads and liftsof water, scaffoldingtaxes and royalty all complete as per buildingspecification and direction of e / i. , providing two coats ofsnowcemofapproved shade and make overold surfaceincluding washing cleaning and preparing the walls , scaffolding, curing and taxes all completeas per building specification and direction of e / i. , providing 2 ( two ) coats of synthetic enamel paint of approved shade & make oversteel surface including cleaning the surface, removing dirt, scales, smokes, grease, scaffolding & taxes all complete as per building specification and direction of e / i. for door, window, common header pipe, valves etc. approx 30m2 , clear water pumping plant: , cost towards supplying and fitting of complete rotating assembly for 50hp centrifugal pump, having head 65m discharge 113.5 m3 / hr make kirloskar with ss pump shaft, c.i. impeller, ss sleeve, bushes, gland tightener 2nos., ball bearing etc all complete with machining as per size and sample, assembling and fitting on the base plate, with all labour tools tackles and technician charges. ( rate after deducting the scrap materials. ) , cost towards supplying and fitting of complete rotating assembly for 50hp centrifugal pump, having head 70 m discharge 114 m3 / hr make wpil with ss pump shaft, c.i. impeller, ss sleeve, bushes, gland tightener 2nos., ball bearing etc all complete with machining as per size and sample, assembling and fitting on the base plate, with all labour tools tackles and technician charges. ( rate after deducting the scrap materials. ) , cost towards supplying and fitting of complete rotating assembly for 60hp centrifugal pump, having head 70 m discharge 160 m3 / hr make mather & platt with ss pump shaft, c.i. impeller, ss sleeve, bushes, gland tightener 2nos., ball bearing etc all complete with machining as per size and sample, assembling and fitting on the base plate, with all labour tools tackles and technician charges. ( rate after deducting the scrap materials. ) , cost towards supply and fitting of 4dia coupling set for 50hp pump set with nut bolt etc all complete. , cost towards supply and fitting of 4diacoupling set for 60hp pump set with nut bolt etc all complete. , supplying, fitting, installation, erecting and commissionning ofapproved make h.t. outdoor type gang operated air break triple pole switch, suitable for 11kv line, rotating type, with 3 post / pin type insulator per phase , mounted in horizontal or vertical position on provided cross arm with adequate length of g.i. pipe for operating handle erected on extended square shaft. the operating handle provided with lock and key at suitable height from ground with necessary clamps including cp, ohc, transportation, labour charges etc. ( rate after deducting the scrap materials. ) , cost towards supplying and fitting of 250a mccb, 3phase, 50hz, isi marked, with all labour tools , tackles and technician charges. with cp & ohc, ( rate after deducting the scrap materials. ) . make l&t / abb / hpl / cg , cost towards supplying and fitting of 160a mccb, 3phase, 50hz, isi marked, with all labour tools , tackles and technician charges. with cp & ohc, ( rate after deducting the scrap materials. ) . make l&t / abb / hpl / cg , cost towards overhauling of motor control panel cum 3 nos. of f.a.s.d. starter panelwith all labour tool, tackles and technician charges for disconnecting the electric line & opening of electric wireconnection inside panel. cleaning, checking, rectifying of faults of 3nos. f.a.s.d. starter with supply and fitting of contacter set ( mnx95 1no and mnx50 1no. ) l&t make or equivalent capacity of isi marked reputed make, over load relay 1no., timer 1no., spp 1no. etc all complete work eachfor 3 nos. fasd starter, dressingand doing fresh electric connection with new wire and connector inside panel, rechecking of all connections and testing on full load. ( rate after deducting the cost of scrap materials ) . for mcp no. 1. , cost towards overhauling of motor control panel cum 2 nos. of f.a.s.d. starter panelwith all labour tool, tackles and technician charges for disconnecting the electric line & opening of electric wireconnection inside panel. cleaning, checking, rectifying of faults of 2nos. f.a.s.d. starter with supply and fitting of contacter set ( mnx70 1no and mnx50 1no. ) l&t make or equivalent capacity of isi marked reputed make, over load relay 1no., timer 1no., spp 1no. etc all complete work each for 2 nos. fasd starter, dressingand doing fresh electric connection with new wire and connector inside panel, rechecking of all connections and testing on full load. ( rate after deducting the cost of scrap materials ) . for mcp no. 2. , cost towards supplying and fitting of 30w led flood light, with bracket, copper wire, on off switch etc with all accessories including all labour tools , tackles and technician charges., with cp & ohc, ( rate after deducting the scrap materials. ) . make havells / syska / mescab / polycab / phillips , providing chipping work on the roof surface of clear water pump house, removing of all garbage to outside with lead of 50 m , providing and cleaning of concrete surface to remove dust and cement laitance by cleaning with compressed air & water jet including all materials, labour, tools complete. ponding test to be done after plugging all outlets and to be checked from soffit to identify seepage, leakage. on identification of seepage, cement grouting to be done with non shrink expanding admixture of sika lndia pvt.ltd. / myk schomberg / dr fixit / fosroc or equivalent. , cost towards providing pcc m 200 in nominal mix of 1:1.5:3on roof with approved quality of stone chips 12mm to 6mm size graded andclean course sand of fm 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete as per building specification and direction of e / i. , providing 12 mm thick water proof cement plaster ( 1:3 ) with clean coarse sand of f m. 1.5 with integral water proofing compound liquid @125 ml per bag cement including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of e / i.brand fosroc conplast x421 lc, sika plastocrate plus, dr fixit pidiproof lw+, myk proof wp 10 or equivalent , dismantling old plaster and pointing in cement or lime and taking out joints to 15mm. depth, watering and disposal of unserviceable materials with all leads all complete as per direction of e / i.inside and outside of pump house, , providing 6mm thick cement plaster ( 1:4 ) in ceiling and wall of building with clean coarse sand of f.m. 15 including screening, curingwith all leads and liftsof water, scaffoldingtaxes and royalty all complete as per buildingspecification and direction of e / i. , providing two coats ofsnowcemofapproved shade and make overold surfaceincluding washing cleaning and preparing the walls , scaffolding, curing and taxes all completeas per building specification and direction of e / i. , providing 2 ( two ) coats of synthetic enamel paint of approved shade & make oversteel surface including cleaning the surface, removing dirt, scales, smokes, grease, scaffolding & taxes all complete as per building specification and direction of e / i. for door, window, common header pipe, valves etc....

Drinking Water And Sanitation Department - Jharkhand

36990246 renovation of rural water supply scheme at khudgaddha , raw water pumping plant: , supplying all labor tools and tackles for taking out old and damaged vt pump sets from intake well with all accessories , demolition of mounting channel for installation of new vertical turbine pump sets. , supplying, installation, testing and commissioning of electrically driven vertical turbine pump sets kirloskar / wpil / mather & plate / jyoti having discharge capacity of raw water127 m3 / hragainsttotal head of 65 meters, coupled with vertical hollow shaft sq. cage induction motor make ( kirloskar / crompton / jyoti ) operated on 415 + 10% volts, 50hz, 1470 rpm with sole plate, discharge head, m.s. d.f. column assembly random length of 5 ft, total 40 ft. s.s. line shaft, s.s, socket, spider bearing with rubber cut less bush, cidf sluice valve 1 no, cidf nr valve 1 no, pressure gauge 1 no ets all complete. note: motor capacity should have 10% above of the pump. , supplying all labor tools and tackles for making pcc foundation 3x3x1 with all materials such as cement , sand, stone chips, foundation bolt, reducer as per sample, including fixing of sole plate for installation of new vt pump sets and jointing the existing delivery pipe line etc all complete job. , cost towards supplying andlaying of 16mm2 x3 core pvc insulated and pvc sheathed , 1.1 kv grade unarmored copper cable of reputed make and isi marked doing connection from panel to both motor. , cost towards making cable mouth for ( a ) 95 mm2 16 nos , ( b ) 16mm2 24nos , cost of doing internal light wiring of pump house with 7 / 18 single core copper wire will all required making short point 1 no, medium point 2 nos, long point 1 no with supplying and fixing 4x40 watt tube light 2 nos, 25 watt, led flood light with bracket 1 no etc all complete , earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 02 nos. for pump set and 02 nos. for transformer ( one body earthing and one neutral earthing ) , cost for supply and fitting of 200amp. tpn main switch / switch disconnectorand doing all line connection. , supplying and laying of 8 swg copper wire for making earthing connection in to from earthing station to panel to motor . , cost towards supplying andlaying of 95 mm2 , 3 ½ core pvc insulated and pvc sheathed , 1.1 kv grade armeredaluminum cable of reputed make and isi marked doing connection from main switch to stabilizer andstabilizer to panel . , providing floor / wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – ( a ) proper distribution 200 amp copper bus bar 4 pole 1 set ( b ) tpn mccb 250 amp l&t / siemens make withearth faultrelay for incoming feeder – 1no. ( c ) mccb 100 amp tp l&t / siemens make for outgoing feeder 2 nos. ( 1no for each pump sets ) ( d ) suitable size of fully automatic star delta starter l & t / bch / schnider make 2 nos. ( e ) with suitable kvr ( capacitor ) for improving power factor ( f ) 0 500 v voltmeter with selector switch 2nosct operated ampere meter ( 0 200a ) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wireetc all complete job and testing on load. , costtowards repairing and complete overhauling of 125 kva servo controlled automatic voltage stabilizer, disconnectingall electric line and joints and checking defects and removing them by s / f of damaged spare parts such as 10 kg operating motor 02 nos , connecting jack 03 nos, r c unite – 02 nos , variac auto transformer 01 no, control card 03 nos and doing internalwiring in propergauge of wire and reassembling the same and test on full load , including tools tackles and labor charges. , supply and top up transformer oil of reputed make , clear water pumping plant: , supplying all labour tools and tackles for taking out old and damaged c / f pump set with all accessories , demolition of foundationfor installation of new hsc centrifugal pump sets. , supplying, installation, testing and commissioning of electrically drivenhorizontal split casing centrifugalpump set make ( kirloskar / wpil / mather& plate / jyoti ) having discharge capacity of clear water33.5 lps againsttotal head of 35 meter coupled with tefc sq. cage induction motor make ( kriloskar / crompton / jyoti ) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with cidf sluice valve 1 no, cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tire coupling 1 no etc all complete. , supplying all labour tools and tackles for making pcc foundtiaon 1 no. of size 4x3’x3 with all materials such as cement , sand, stone chips, foundation bolt 6nos, reducer and plastering and punning over exposed surface and jointing the existing delivery and suctionpipeline etc all complete job. , providing floor / wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – ( a ) proper distribution 200 amp copper bus bar 4 pole 1 set ( b ) tpn mccb 250 amp l&t / siemens make withearth faultrelay for incoming feeder – 1no. ( c ) mccb 100 amp tp l&t / siemens make for outgoing feeder 2 nos. ( 1no for each pump sets ) ( d ) suitable size of fully automatic star delta starter l & t / bch / schnider make 2 nos. ( e ) with suitable kvr ( capacitor ) for improving power factor ( f ) 0 500 v voltmeter with selector switch 2nosct operated ampere meter ( 0 200a ) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wireetc all complete job and testing on load. , cost towards supplying andlaying of 50 mm2 x , 3 ½ core pvc insulated and pvc sheathed , 1.1 kv grade armored aluminum cable of reputed make and isi marked doing connection from pole to panel board . , cost towards supplying and laying of 10 mm2 , 3 core pvc insulated and pvc sheathed, 1.1 kv grade unarmored copper cable of reputed make and isi marked for doing connection from panel to motor.jsor m1062 , cost towards making cable mouth for ( a ) 50 mm2 16nos , ( b ) 10mm2 24nos , cost of doing internal light wiring of pump house with 7 / 18 single core copper wire will all required making short point 1 no, medium point 2nos, long point 1 no with supplying and fixing 4x40 watt tube light 1 nos, 25 watt, led flood light with bracket 1 no etc including materials and labor chargesall compelte 1 job. , earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonary with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 02 nos. for pump set and 02 nos. for transformer ( one body earthing and one neutral earthing ) , supplying and laying of 8 swg copper wire for making earthing connection in to from earthing station to panel to motor. , cost for supply and fitting of 200 amp. tpn main switch / switch disconnector and doing all line connection. , costtowards repairing and complete overhauling of 60 kva servo controlled automatic voltage stabilizer, disconnectingall electric line and joints and checking defects and removing them by s / f of damaged spare parts such as 10 kg operating motor 02 nos , carbon brush 03 nos, main transformer 01 no , control transformer 01 no and doing internalwiring in propergauge of wire and reassembling the same and test on full load , including tools tackles and labor charges. , supply and top up transformer oil of reputed make...

Drinking Water And Sanitation Department - Jharkhand

36990237 renovation of rural water supply scheme at bandh basti kathara , raw water pumping plant: , supplying all labor tools and tackles for taking out old and damaged vt pump sets from intake well with all accessories , demolition of mounting channel for installation of new vertical turbine pump sets. , supplying, installation, testing and commissioning of electrically driven vertical turbine pump sets kirloskar / wpil/ mather & plate/jyoti having discharge capacity of raw water60 m3/hragainsttotal head of25 meters, coupled with vertical hollow shaft sq. cage induction motor make (kirloskar / crompton/ jyoti) operated on 415 + 10% volts, 50hz, 1470 rpm with sole plate, discharge head, m.s. d.f. column assembly random length of 5 ft, total 40 ft. s.s. line shaft, s.s, socket, spider bearing with rubber cut less bush, cidf sluice valve 1 no,cidf nr valve 1 no, pressure gauge 1 no ets all complete. note: motor capacity should have 10% above of the pump. , supplying all labor tools and tackles for making pcc foundation 3x3x1 with all materials such as cement , sand, stone chips, foundation bolt, reducer as per sample, including fixing of sole plate for installation of new vt pump sets and jointing the existing delivery pipe line etc all complete job. , cost towards supplying andlaying of 06 mm2 x3 core pvc insulated and pvc sheathed ,1.1 kv grade unarmored copper cable of reputed make and isi marked doing connection from panel to both motor. , cost towards making cable mouth for (a) 50 mm2 16 nos , (b) 06 mm2 24nos , cost of doing internal light wiring of pump house with 7/18 single core copper wire will all required making short point 1 no, medium point 2 nos, long point 1 no with supplying and fixing 4x40 watt tube light 2 nos, 25 watt, led flood light with bracket 1 no etc all complete , earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal/ coke and salt as required for chemical earthing. 02 nos. for pump set and 02 nos. for transformer (one body earthing and one neutral earthing ) , cost for supply and fitting of 200 amp. tpn main switch/ switch disconnectorand doing all line connection. , supplying and laying of 8 swg copper wire for making earthing connection in to from earthing station to panel to motor . , cost towards supplying andlaying of 50 mm2 , 3 ½ core pvc insulated and pvc sheathed ,1.1 kv grade armeredaluminum cable of reputed make and isi marked doing connection from main switch to stabilizer andstabilizer to panel . , providing floor/wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – (a) proper distribution 200 amp copper bus bar 4 pole 1 set (b) tpn mccb 100 amp l&t/ siemens make withearth faultrelay for incoming feeder – 1no. (c) mccb 100 amp tp l&t /siemens make for outgoing feeder 2 nos.(1no for each pump sets) (d) suitable size of fully automatic star delta starter l & t/ bch/schnider make 2 nos., (e) with suitable kvr (capacitor) for improving power factor (f) 0 500 v voltmeter with selector switch 2nosct operated ampere meter (0 200a) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wireetc all complete job and testing on load. , providing, erecting 30 kva servo controlled automatic voltage stabilizer suitable for output voltage 415v+/ 1% and input 280 450 v, 3 phase ,50 hz , with copper wound transformer (oil cooled ) as mentioned below. the stabilizer shall function satisfactorily even if incoming supply is unbalanced between the phases within range of 10%. the stabilizer should be constructed in cubical box ,with by bidirectional wheels for easy handlingnecessarymonitors and users controls on front panel such as indication , alarm ,voltmeterand selector switch formeasuring input and output voltage , auto/manual selector switch , raise/low push buttons etc.suitable capacity termination strips and bush bars for incoming & outgoing cable should be provided. all three phases shall be independently monitored and corrected. following protections and indications shall be incorporated as per is :9815 (a) over voltage /under voltage (b) single phasing (c) cut off contractor with electronicoutput sensing unite suitable change over switch and earthing. , supply and top up transformer oil of reputed make , clear water pumping plant: , supplying all labour tools and tackles for taking out old and damaged c/f pump set with all accessories , demolition of foundationfor installation of new hsc centrifugal pump sets. , supplying, installation, testing and commissioning of electrically drivenhorizontal split casing centrifugalpump set make(kirloskar/ wpil/ mather& plate/jyoti ) having discharge capacity of clear water50 m3/hragainsttotal head of 45 meter coupled with tefc sq. cage induction motor make (kriloskar/ crompton /jyoti) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with cidf sluice valve 1 no,cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tire coupling 1 no etc all complete. , supplying all labour tools and tackles for making pcc foundtiaon 1nos, of size 4x3’x3 with all materials such as cement , sand, stone chips, foundation bolt 6nos,reducer and plastering and punning over exposed surface and jointing the existing delivery and suctionpipeline etc all complete job. , providing floor/wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – (a) proper distribution 200 amp copper bus bar 4 pole 1 set (b)tpn mccb 200 amp l&t/ siemens make withearth faultrelay for incoming feeder – 1no. (c) mccb 100 amp tp l&t /siemens make for outgoing feeder 2 nos.(1no for each pump sets) (d) suitable size of fully automatic star delta starter l & t/ bch/schnider make 2 nos. (e) with suitable kvr (capacitor) for improving power factor (f) 0 500 v voltmeter with selector switch 2nosct operated ampere meter (0 200a) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wireetc all complete job and testing on load. , cost towards supplying andlaying of 70 mm2 x , 3 ½ core pvc insulated and pvc sheathed ,1.1 kv grade armored aluminum cable of reputed make and isi marked doing connection from main switch to stabilizer and stabilizer to panel board . , cost towards supplying and laying of 10 mm2 , 3 core pvc insulated and pvc sheathed,1.1 kv grade unarmored copper cable of reputed make and isi marked for doing connection from panel to motor. , cost towards making cable mouth for (a) 70 mm2 16nos , (b) 10mm2 24 nos , cost of doing internal light wiring of pump house with 7/18 single core copper wire will all required making short point 1 no, medium point 2nos, long point 1 no with supplying and fixing 4x40 watt tube light 1 nos, 25 watt, led flood light with bracket 1 no etc including materials and labor chargesall compelte 1 job. , earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonary with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal/ coke and salt as required for chemical earthing. 02 nos. for pump set and 02 nos. for transformer (one body earthing and one neutral earthing ) , supplying and laying of 8 swg copper wire for making earthing connection in to from earthing station to panel to motor. , cost for supply and fitting of 200 amp. tpn main switch/ switch disconnector and doing all line connection. , providing, erecting 50 kva servo controlled automatic voltage stabilizer suitable for output voltage 415v+/ 1% and input 280 450 v, 3 phase ,50 hz , with copper wound transformer (oil cooled ) as mentioned below. the stabilizer shall function satisfactorily even if incoming supply is unbalanced between the phases within range of 10%. the stabilizer should be constructed in cubical box ,with by bidirectional wheels for easy handlingnecessarymonitors and users controls on front panel such as indication , alarm ,voltmeterand selector switch formeasuring input and output voltage , auto/manual selector switch , raise/low push buttons etc.suitable capacity termination strips and bush bars for incoming & outgoing cable should be provided. all three phases shall be independently monitored and corrected. following protections and indications shall be incorporated as per is :9815 (a) over voltage /under voltage (b) single phasing (c) cut off contractor with electronicoutput sensing unite suitable change over switch and earthing. , supply and top up transformer oil of reputed make...

Health Department - Jharkhand

36976606 rate contact for fire safter works fire safter works , fire fighting and hydrant system , supply, installation, testing and commissioning of pressure switches in ms pipe for hydrant electric pump/ sprinkler electric pump/ diesel engine drivenpump/ jockey pumps, diaphragm type adjustable range from 0 10kg/sq. cm and a regulation range of 0.1 1.5 kg/sq.cm direct mounted snap acting type made from die cast aluminium with epoxy powder coated finishand ss316 diaphragm and other materials parts, including necessary wiring upto control panel & materials as required as per specifications. approved make: indfoss/dandfoss , supplying & fixing internal and external stainless steel single headed fire hydrant landing valve with instantaneous stainless steel coupling of 63mm dia with cast iron wheel isi marked conforming to is:5290 (type a) with blank pvc cap and chain as required approved make: newage / safex / shah bhogilal / kartar , providing & fixing 63 mm dia stainless steel short branch pipe with 20mm with hose box lockable type single door (nominal internal diameter) in size stainless steel nozzle conforming to is:903 suitable for instantaneous connection complete to inter connect hose pipe, coupling etc. as required and as per enclosed specification. approved make: newage /safex / shah bhogilal , providing & fixing 63mm dia. 15mtr, long rrl hose pipe (isi marked) with 63mm dia. male and female stainless steel couplings , duly binded with gi wire, rivets etc. conforming to is 636 (type a) complete as required & as per enclosed specification. approved mark : newage / crc , providing and fixing first aid hose reel 20mm dia. x 30m long (minimum length) (thermoplastic type as per i.s. 12585) complete with drum, bracket, 25mm dia. shut off valve and 5mm gun metal nozzle conforming to is :884, connection with riser with ms c class pipe, painting the ms works complete as required & as per enclosed specification. approved make: newage / safex / shah bhogilal , providing and fixing 4 way gun metal fire brigade inlet connection comprising of 4 nos. 63mm dia. male instantaneous inlet couplings with cap and chain as required for 150mm dia. flanged conforming to is 904 complete (to be connected to static tank) as required and as per enclosed specification. approved make : newage / safex / shah bhogilal/kartar , providing and fixing fire brigade suction hose coupling (draw out connection) with nut for female coupling as per is 902 complete with 150mm dia. suction pipe and foot valve (to be connected to static tank) complete as required and as per enclosed specification . approved make: newage / safex / shah bhogilal/ kartar , supply, installation testing & commissioning of two way gun metal fire brigade inlet connection consisting of 63mm size instantaneously male coupling and shall be protected by cap scored with a chain glass bore etc. complete with one butter fly valve and 1 nos non return valve.( for external ring main, tower hydrant)approved make: newage/ safex/ shah bhogilal , pipes & valves , providing, fixing, jointing and commissioning of following sizes of c class heavy duty mild steel pipes conforming to is 1239/is 3589, including cutting welding, threading, hut bolts gasket, fitting, viz bends, ceiling/ beam/floor with suitable ms clamps / structural supports/ pcc block and painting complete as required and as per enclosed specification . approved make: tata/ jindal/apollo note: the pies size 150mm & below shall be m.s.c class as per is : 1239 and pipes size above 150mm shall be welded black steel pipe heavy class as per is:3589, from minimum 6.35mm thick m.s. sheet for pipes upto 350mm dia. and from minimum 7mm thick ms sheet for pipes of 400mm dia and above. , 150 mm dia. , 100 mm dia. , 80 mm dia. , 50 mm dia. , 25 mm dia. , providing fixing testing and commissioning of following sizes of gate valve of rating pn 16, wafer type in cast iron body with ductile lron disc, epdm seal, ss single piece shaft conforming to is 13095 of the following sizes complete with cast iron hand lever companion flanges, bolts nuts washers & inserted rubber gaskets, as required and as per enclosed specification. approved make: leasderloto.oto/sant , 150 mm dia. , 100 mm dia. , providing, fixing, testing and commissioning of following size of ci non return valve conforming to api 594 with c.i. body, ss disc, ss stem, epdm seal, completewith companionflanges, bolts, nuts, washers & inserted rubber gasket complete as required and as per enclosed specification. (pn 16) approved make: leader/zoloto / sant 100 mm dia. , providing & fixing of 25mm dia. gunmetal , air release valve with all fitting and forged ball valve on header complete as required and as per enclosed specification. approved make: leader/zoloto / sant , providing and fixing following size pressure gauge (0 15 kg/cm2) complete with shut off valve duly calibrated before installation complete as required & as per enclosed specification. 150mm dia. approved make: h.guru / feibig , providing, fixing & installation of control valve (sprinkler alarm valve) of cast iron body and bronze working parts comprising of water motor alarm, bronze seat clapper and clapper arm, hydraulically driven mechanical gong bell to sound continuous alarm when the wet riser/sprinkler system activates, pressure gauges, emergency releases, strainer, pressure switch, cock valve complete with drain valve and bypass, test control box, ball valves, flanges, orifice plate, fittings, gasket etc. suitable for 150 mm diameter pipe size complete as required as per enclosed specification. approved make: hd / newage , automatic sprinkler system , providing & fixing of 15 mm dia. sprinkler head with standard response quartzite bulb operate at 68 degree c complete with all accessories as required and as per enclosed specification (ul listed) pendent type in chrome finish (standard coverage) approved make: hd / tyco/vking/newage , providing and fixing electrically operated flow indicating switches vane type with threaded connection for indicating water flow in sprinkler branch line with necessary junction box in stalled in accessible place. including cost of cable etc. complete. (wiring from switches to panel and stair case pressurisation not included). , approved make: honeywell/ sensotronic system/ switzer , providing and fixing 25mm dia inspecting & testing assembly with s.s. isolation valve s.s. sight glass byepass valve & connected to line drain complete in all respect as per standard practice of code including pressure gauges of approved make. approved make: reliable /hd/ul/listed , fire extinguisher , supply, installation, testing and commissioning isi marked (is:15683) fire extinguisher, carbon di oxide type capacity 4.5 kg. flat base including valve, discharge hose of not less than 10mm dia, 1m long and complete in all respects including initial fill with co2 gas conforming to is: 307 1966 and wall suspensionbraket as required as per specifications. approved make: minimax/ safex/ cease fire/ safeguard , blood bank (co2 trolly 9 kg) , new building (co2 4.5 kg) , red building (co2 trolly 9 kg) , c.s office (co2 trolly 9 kg) , other urban health institution of ranchi , supply, installation, testing and commissioning of 6kg abc (powder/dcp type) fire extinguisher , mid steel cylinders isi marked fitted with pressure indicating gauge, internal tube, squeeze lever type valve fully charged with abc 90 powder (mono ammonium phosphate) pressured by nitrogen complete in all respects including wall suspension bracket and conforming to is : 15683 as required as per specifications . approved make: minimax/ safex/ cease fire/ safeguard/safepro/ kanex , mechanical foam type fire extinguisher in hp mild steel cylinders isi marked / approved fitted with pressure indicating gauge, internal tube, squeeze lever type valve fully charged complete in all respects including wall suspension bracket / trolley , mounted and conforming to is:910 50 litres (trolley mounted) approved make: minimax / safex / cease fire / safeguard , fireterrace pump type:end suction speed (rpm): 2900 capacity: 900 ipm head : 35mtr. , providing fixing, testing and commissioning of control panel for terrace booster pumps. incoming: mccb 35a 1 set of phase indicating lamps, 1 set of 35al bus bars, 1 no ammeter, 1 no voltmeter withphase selector switch feeder for booster pumps 1no. 1 no. 32a tp mccb without releases, dol starter with over load relay , single phase preventer and indicating lamps with on/off push buttons. 1 no . automanual selector switch ,suitable for booster pumps water reservoir 1.00l , fire alarm and detection works , conventional type / addressable type manual alarm system , supply installation testing and commissioning of 24v manual call point mcp agni/morley/siemens , supply installation , testing & commissioning of 24 v hooter agni/morley/siemens , supply installation , testing & commissioning of 6/8 zone control panel agni/morley/siemens , wire 2x1.5mm armoud cable fire proof (anchor/poly cap / havlles) , supply installation , testing & commissioning of smoke + heat detector ionised type with base agni/morley/siemens , supply installation , testing & commissioning of response indicator 24v agni/morley/siemens , civil work , supply installation& commissioning of 5000 letters of sintex water container (four layer) for over head water storage for fire hydrant& fire sprinkler system , construction of rcc over head water tank with 20,000 l water capacity with superior quality concrete, steel & materials , fire suppression system , supply installation& commissioning of fire suppression system fk5112 specially for fire panal automatic type life guard / spectra/ novac , supply refilling and maintenance of fire extinguisher cylinder of all building of sadar hospital ranchi , fire safety mock drill of 100 people of sadar hospital ranchi given quarterly , maintenance of water reservoirof 200000 l & repairing if needed , general maintenance of fire fighting amc including, testing , repairing & refilling of cylinder only...

East Central Railway - Jharkhand

36870730 supply of three phase variac 0 480 v ac, 1 1 5 1 50a ( three phase variable supply ) 3 phase 4 wire with digital voltmeter & ammeter for showing the load 0 440v variable power supply enclosed type manual or motor operated suitable for testing 60kva three phase transformer & other electrical equipment oil cooled suitable for floor mounting. [ warranty period: 30 months after the date of delivery ] => limited...

Drinking Water And Sanitation Department - Jharkhand

36710992 supply, installation testing and commissioning of centrifugal pump sets with its allied work at boosting station clear water pumping plant of katras under d.w. & s. mechanical division, dhanbad for the year 2022 23. supply installation testing and commissioning of centrifugal pump sets with its allied work at boosting station clear water pumping plant katras , boosting station clear water pumping plant katras , supplying all labour tools and tackles for taking out old and damaged c/f pump set with all accessories , demolition of foundationfor installation of new hsc centrifugal pump sets. , supplying, installation, testing and commissioning of electrically drivenhorizontal split casing centrifugalpump set make(kirloskar/ wpil/ mather & plate/jyoti ) having discharge capacity of clear water45lps againsttotal head of 50 meter coupled with tefc sq. cage induction motor make (kriloskar/crompton/jyoti) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with cidf sluice valve 1 no,cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tire coupling 1 no etc all complete. , supplying all labour tools and tackles for making pcc foundtiaon 2nos, of size 5x3x3 with all materials such as cement , sand, stone chips, foundation bolt 6nos etc all complete and plastering and punning over exposed surface. , providing floor/wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – proper distribution 315 amp copper bus bar 4 pole 1 set micro processor base tpn mccb315 amp l&t/ siemens make withearth faultrelay for incoming feeder – 1no. mccb 315 amp tp l&t /siemens make for outgoing feeder 6 nos.(1no for each pump sets) 315 amp. (main switch)tpn isolater switch 1nos suitable size of fully automatic star delta starter l & t/ bch/schnider make 2 nos. 0 500 v voltmeter with selector switch 2nosct operated ampere meter (0 200a) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wireetc all complete job and testing on load. , cost towards supplying andlaying of 185 mm2 x , 3 ½ core pvc insulated and pvc sheathed ,1.1 kv grade armered aluminium cable of reputed make and isi marked doing connection from pole to panel board . , cost towards supplying and laying of 16mm2 , 3 core pvc insulated and pvc sheathed,1.1 kv grade unarmered copper cable of reputed make and isi marked for doing connection from panel to motor. , cost towards making cable mouth for 185mm2 8nos , 16mm2 24nos , earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonary with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal/ coke and salt as required for chemical earthing. , supplying and laying of 8 swg copper wire for making earthing connection in to from earthing station to panel to motor . , cost for supply and fitting of 30 watt led flood light with bracket and doing line connection and testing. , cost for supplyin and laying of suction pipe line with supply and fiting of 6dia heavu duty gi pipe 6mtr, bend 1no, flange 6nos, but bolt+ washer 10 kg, rubber insertion 10kg cutting of pipe in required length and doing proper welding and fitting at site with at labour tools and tackles. , cost for delivery line with supply and fitting of 6dia heavy duty gi pipe 3mtr, bend 2nos, flange 4nos, nu bolt and washer 8kg.rubber insertion 8kg. and cutting of pipe in required size and welding work etc all complete...

Department of Higher Education - Jharkhand

36433511 bids are invited for 1 portable wattmeter 0 3kw, 0 5 / 10a, 75 / 150 / 300 v, upf 10 2 portable wattmeter 3 kw, 0 10 / 20 a, 300 / 600 v, upf 10 3 portable watt meter ( 3 phase ) 6kw, 0 10 / 20 a, 300 / 600 v 06 4 portable watt meter 0 2.5 / 5 a, 75 / 150 v, lpf 06 5 ac analog ammeter ( 0 5 / 10 ) a.ac 06 6 ac analog ammeter ( 0 15 / 30 ) a, ac 06 7 ac analog ammeter ( 0 1 / 2 ) a, ac 06 8 dc analog ammeter ( 0 2.5 / 5 ) a, dc 06 9 ac analog voltmeter 0 150 / 300 v, ac 08 10 ac analog voltmeter 0 300 / 600 v, ac 08 11 dc analog voltmeter 0 300 v, dc 06 12 rheostat 2a, 300 ohm 06 13 rheostat 0.1 a, 1000 ohm 06 14 rheostat 1.5 a, 356 ohm 06 15 3 arm rheostat 10 a, 50 ohm 06 16 3 phase loading rheostat input : 415v, ac output : 15 a / phase 5kw / 10 kw 06 17 1 phase auto transformer input : 240v, ac output : 0 270 v current capacity : 10 a 10 18 3 phase auto transformer input : 415v, ac output : 0 440 / 470 v current capacity : 10 a 05 19 dc rectifier unit...

Drinking Water And Sanitation Department - Jharkhand

36310525 dwsd dhanbad 03 2022 23 group c supply installation testing and commissioning of centrifugal pump sets with its allied work at boosting stating clear water pumping plant of katras , boosting station clear water pumping plant katras , supplying all labour tools and tackles for taking out old and damaged c/f pump set with all accessories , demolition of foundationfor installation of new hsc centrifugal pump sets. , supplying, installation, testing and commissioning of electrically drivenhorizontal split casing centrifugalpump set make(kirloskar/ wpil/ mather & plate/jyoti ) having discharge capacity of clear water45lps againsttotal head of 50 meter coupled with tefc sq. cage induction motor make (kriloskar/crompton/jyoti) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with cidf sluice valve 1 no,cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tire coupling 1 no etc all complete. , supplying all labour tools and tackles for making pcc foundtiaon 2nos, of size 5x3x3 with all materials such as cement , sand, stone chips, foundation bolt 6nos etc all complete and plastering and punning over exposed surface. , providing floor/wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – proper distribution 315 amp copper bus bar 4 pole 1 set micro processor base tpn mccb315 amp l&t/ siemens make withearth faultrelay for incoming feeder – 1no. mccb 315 amp tp l&t /siemens make for outgoing feeder 6 nos.(1no for each pump sets) 315 amp. (main switch)tpn isolater switch 1nos suitable size of fully automatic star delta starter l & t/ bch/schnider make 2 nos. 0 500 v voltmeter with selector switch 2nosct operated ampere meter (0 200a) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wireetc all complete job and testing on load. , cost towards supplying andlaying of 185 mm2 x , 3 ½ core pvc insulated and pvc sheathed ,1.1 kv grade armered aluminium cable of reputed make and isi marked doing connection from pole to panel board . , cost towards supplying and laying of 16mm2 , 3 core pvc insulated and pvc sheathed,1.1 kv grade unarmered copper cable of reputed make and isi marked for doing connection from panel to motor. , cost towards making cable mouth for 185mm2 8nos , 16mm2 24nos , earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonary with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal/ coke and salt as required for chemical earthing. , supplying and laying of 8 swg copper wire for making earthing connection in to from earthing station to panel to motor . , cost for supply and fitting of 30 watt led flood light with bracket and doing line connection and testing. , cost for supplyin and laying of suction pipe line with supply and fiting of 6dia heavu duty gi pipe 6mtr, bend 1no, flange 6nos, but bolt+ washer 10 kg, rubber insertion 10kg cutting of pipe in required length and doing proper welding and fitting at site with at labour tools and tackles. , cost for delivery line with supply and fitting of 6dia heavy duty gi pipe 3mtr, bend 2nos, flange 4nos, nu bolt and washer 8kg.rubber insertion 8kg. and cutting of pipe in required size and welding work etc all complete...

Central Coalfields Limited - Jharkhand

36270424 bids are invited for spares for prabhu make flp starter mse shunt trip assembly with coil part no flpvcb004 , vacuum interrupter 400a part no flpvcb006 , coil for shunt trip or spring release part no flpvcb017 , auxilary transformer for control circuit part no flpvcb023 , earth leakage relay part no flpvcb024 , epoxy molded cor balance transformer 3 point3 part no flpvcb025 , 3 pole magnetic over load relay part no htsp0019 , solid state overload and short circuit rel part no flpvcb026a , auxillary contc 3no plus 1nc plus110v coll part no flpvcb028 , diode based rectifier complete part no flpvcb029 , epoxy resin moulded c t for ammeter part no flpvcb032 , epoxy resin moulded 3 phase p t 3 point 3kv 11 part no vcbf00155 , pt fuse 3 point 3 kv part no flpvcb035 , led lamp holder with lamp vacuum circuit part no flpvcb043 , 72 sq mm ammeter ct operated part no flpvcb036 , 72 sq mm voltmeter 0 to 5 kv ptr 3 point 3kv 110v part no flpvcb037 total quantity : 123...

South Eastern Railways - Jharkhand

36238090 supply of 2 hp submersible pump2 hp submersible pump, 2 hp submersible pump, single phase with dol starter with voltmeter, ammeter, overload relay, head minimum 214 mtr. discharge: 0.5 0.9 m3 / hrs, discharge pipe dia 32 mm, make: kirloskar, cri, ksb or similar. [ warranty period: 24 months after the date of delivery ] ...

Department of Higher Education - Jharkhand

36224408 bids are invited for supply and installation of lab equipment leak transformer for sodium vapour lamp , spectrometer vernier , modern laser educational kit , diffraction grating , optical fibre characteristics kit , component tester , newtons rings apparatus , reading telescope with stand , reading telescope deluxe type , convex mirror highly silvered , concave mirror highly silvered , bar pendulum , lummer brodhum photometer set up , ammeter , voltmeter , rheostat , accumulator , commutator , current carrying coil , compass box for magnetometer , vernier calliper , screw gauge , spharometer , meter scale , lcr circuit kit , photoelectric effect experiment setup total quantity : 86...

East Central Railway - Jharkhand

36106373 supply of battery voltmeter ( uba ) , range 0 150v, specification / drg. : clw / es / 3 / sk / 0073 and drg. no. clw / es / 3 / ski / 0073 or latest. [ warranty period: 30 months after the date of delivery ] csd / trs / mgs , ecr uttar pradesh 58.00 numbers...

Ministry Of Coal - Jharkhand

36094935 bids are invited for spares for 11kv vcb shunt trip coil , vaccum interrupter , vaccum circuit breaker complete , indicating lamp , push buttons , trip natural close switch tnc , rectifire capacitor unit , 11kv, 110v, 100va per phase 3 phase pt , resin cast ct class p10, class1 , ammeter 96 sqmm , local remote switch , voltmeter 96sqmm , tpnd oc ef realy with high set , sensitive elr door mounted , pt fuse 11 kv , sensitive elr base mounted , om off isolater , over volatage relay , under voltage relay , pilot relay 110v dc , push to trip knob total quantity : 53...

Indian Army - Jharkhand

35997914 bids are invited for acsfp spare ammeter ac mi 0 100 amps ct ratio 96mm sq , frequency meter , voltmeter ac moving iron 10 300v 72 mm sq , bty charging regulaor , filter fluid pressure element lub oil f total quantity : 15...

Department of Higher Education - Jharkhand

35902955 bids are invited for item 1 portable wattmeter as per item 1 in specification document item 2 portable wattmeter as per item 2 in specification document item 3 portable wattmeter as per item 3 in specification document item 4 portable wattmeter as per item 4 in specification document item 5 ac analog ammeter as per item 5 in specification document item 6 ac analog ammeter as per item 6 in specification document item 7 ac analog ammeter as per item 7 in specification document item 8 dc analog ammeter as per item 8 in specification document item 9 ac analog voltmeter as per item 9 in specification document item 10 ac analog voltmeter as per item 10 in specification document item 11 dc analog voltmeter as per item 11 in specification document item 12 rheostat as per item 12 in specification document item 13 rheostat as per item 13 in specification document item 14 rheostat as per item 14 in specification document item 15 3 arm rheostat as per item 15 in specification document item 16 3 phase loading rheostat as per item 16 in specification document item 17 1 phase auto transformer as per item 17 in specification document item 18 3 phase auto transformer as per item 18 in specification document item 19 dc rectifier unit as per item 19 in specification document...

Kendriya Vidyalaya Sangathan - Jharkhand

35763580 bids are invited for school lab items mse burette 500ml , burtette stand , test tube , beaker 250 ml , beaker 100 ml , conical flask 125 ml , conical flask 250 ml , nh4oh 500 gm , red litmus , dropper , kerosene 500 ml , volumertic flask , high precision lab scalg digital analytical electromic balance , zn gramules , iron fillings , funnd glass , laboratary voltmeter , laboratory ammeter , prism , spherometer , concave mirror , convaex mirror , concave lens , convex lens , ph paper , universal indicator 500 ml , acetic acid 500 ml , methyl alcahol 500 ml , hydrochloric acid 500 ml , acetoarmine , suerose 500 gm , basic acid 500 ml , calcium nitrate 500 gm , magnesium sulphate 500 gm , potassium nitrate 500 gm , sodium choride 500 gm , starch 500 gm , iodine 100 ml , bendic solution 500 ml , felling solution a 500 ml , felling solution b 500 ml , ethyl alchohal 500 ml total quantity : 1078...

South Eastern Railways - Jharkhand

35760751 supply of voltmeter o 800 v ac 1.5. size 72 sq.mm ( square type ) . accepted make as per bom of rdso spec. no. rdso / pe / spec / ac / 0184 2015 ( rev 0 ) ae / muller+zeigler / rishabh / l&t / yokins ( copy attached ) . [ warranty period: 30 months after the date of delivery ] divisional gsd rnc , ser jharkhand 30.00 numbers...

South Eastern Railways - Jharkhand

35756868 supply of resistance 88 k.ohm. in 9 watts ( + / 1% ) for tm voltmeter for wap4 & wag7 locos to clws spec. no.clw / es / i 21 / a. [ warranty period: 30 months after the date of delivery ] amm / elins / bksc electric jharkhand 3.00 numbers loco ispat nagar stores , ser...

Central Coalfields Limited - Jharkhand

35584481 bids are invited for transswitch units 3 point 3 kv grade h t c t epoxy resin cas part no fcbp0021 , 3 point 3 kv epxy resin cast pt 3 point 3 kv 110 v 12 v part no fcbp0024 , 2 point 5 round amtr 0 400 200a ctr 2 00 100 5 a part no fcbp0030 , 2 point 5 round flush type voltmeter 0 to 4 kv ptr part no fcbp0032 , indicating lamp led 12 vac set rplus g plus a part no fcbm0042 , aux contactor 110 v ac part no fcbm0043 , limit switch 1 no plus 1 nc part no fcbm0056 , limit switch 02 no plus 02 nc part no fcbm0057 , elr 50ma to 750ma part no fcbt0078 , ntrl erthng rsstr mntrng relay 50 to 750ma part no fcbt0078 , shunt trip coil assembly part no v0021 spares for electroteknica make 3 point kv to 550v flp total quantity : 65...

Drinking Water And Sanitation Department - Jharkhand

35489091 e quotation for electro mechanical components by supplying and fitting and replacing of electro mechanical components of baharagora multi village rural water supply scheme 1 boosting p/plant w.t.pat mohanpur of bahragoda rwss cost towards supply installation and testing and commissioning of horizontal split casing type centrifugal pump make mather &platt/kirloskar /wpil capable of discharhing 100 m³/hr clear water against total head 30 meters, coupled with suitable 3 phase. 1440 rpm, 50hz tefc sq. cage induction motor make kirloskar, cgl/abb mounted on a common m.s. channel fabricated base plate with following accessories 1. sutable size n.r valve1 no2. sutable size sluice valve 1 no3. sutable size check valve/foot valve1 no4. pressure gauge1 no5. m.s base plate 1 no6. tyre coupling set 1 noetc all complete. 2 cost towards dismantling of old foundation and removing the residuals out of the pumping plant and making of new pcc foundation 4’x3’ x2.5’ size & m.s joint 4”x6” 2 nos. with supplying all mortar materials & foundation bolts 6 nos. with all labour tools and tackles loading unloading with alignment leveling and jointing as per p.w.d specification (1:2:4) etc all complete. 3 cost towards supplying installation & commissioning of 160 amp, 440 vmotor panel board made of 2mm thick ms sheet of suitable size, dust and vermin proof consisting of following accesories :(i)160 amp mccb – 1 no.(incoming feeder) (ii)100 amp mccb – 02nos (outgoing feeder). (iii)32 amp mcb 1 no. for lighting load and other utiliti load.(iv)fasd starter suitable for the 12.5 hp motor pumpset – 2 nos.(l&t make)(v)copper bus bar 4 pole 160 amp 415volt copper strip bus bar enclosed in ms sheet, etc. all complete job. (vi)led display voltmeter – (0 500 v) & amp meter(0 100a) – 2 sets, phase indicating lamp 6 nos.along with overload relay, single phase preventer proper inside wiring with suitable size of copper conductor with wall/floor mounting facility, cubical panel box etc. all complete including transportation and fitting and mounting charges at p/plant. 4 cost towards repairingof 63 kva transformer with changing of ht & lt bush 3 sets each , top up transformer oil upto 100 ltrs, fuse wires as per required. 5 cost towards supplying and laying of 3core 95 sq.mm aluminium armoured cable from transformer to mcp 6 cost towards chemical earthing 40feet and 80mm hole size with electrode and chemical compound etc. with watering pipe and locking arrangements including soldering, riveting, jointing g.i. flat strip 20mm x 3mm to all equipments. 7 cost towards supplying and installing 100 watt led street light complete set all complete including labour charges. for clear water p/plant. 8 cost towards supplying installation and commissioning of 63 kva servo controlled (oil cooled) automatic voltage stabilizer suitable for output voltage of 415 + 1% 3 phase, 50 hz with copper wound transformer as mentioned below. the stabilizer shall function satisfactorily even if incoming supply is unbalanced between phases within range of 10%.the stabilizer should be constructed in cubical box,with bidirectional wheels for easy handling necessary monitors and user’s controls on front panel such as inducation alarm, voltmeter and selector switch for measuring input and output voltage auto manual selector switch.raise low push buttons etc. suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided .all three phases shall be independently monitored and corrected following protections and indication shall be incorporated as per is:9815a) over voltage/under voltageb)single phasing c) cut off contactorwith electronic output sensing unit d) suitable change over switch and earthing 100 kva oil cooled servo controlled automatic voltage stabilizer (output 415 unit+ 1%) input 280 to 450 volt. make: powerline/servokon 9 cost towards of changeover switch tpn on load with sheet sheel enclosure capacity amp for by pass arrangement of servo voltage stabilizer make c&s havell s/l&t with all labour & tools and materials. 10 supplying and laying of 25 sq.mmx3core x1.1 kv grade with isi make pvc insulated and unarmored flexible copper cable from mcp to motor terminal box with suitable copper lugs etc 11 part –braw water pumping plant – intake well at jamsola providing all labours, tools, tackels and technician fordisconnection and taking out20 hp vt p/set with column pipe into intake well all complete. 12 cost towards all labour, tools, tackles and technicianfor opening, dismantling. repairing and overhauling of20 hp 04 stage bow l assembly vt pump having head58 meter. discharge 43m3/hr speed 1460 rpmi. with s/f of s.s. pump shaft 01 no.ii. top and bottom bush 02 nos.,iii. intermediate bushes 5 nos.iv. spider cut less rubber bushes 04 nos.v. locks vi. impeller copper bush 06 pcs.vii. g.m. impeller 04 nos. viii. 30mm dias.s. line shaft 10 ft each 3 nos.ix. 30mm dia. ss.head shaft 5 ft. each i nos.x s. s socket and bush 04 nos. each. xi, ferro collar ball rubber bush 12pc xii. ball sleeve bush 07 nos each all materials as per required reassembling the same at workshop refitting at site etc. all complete(rate after deducting the scrap materials). 13 providing all labours, tools, tackels and technician forloweringafter repairing of20 hp vt p/set with column pipe into intake well all complete. 14 cost towards supplying all labour tools and tackles for complete opening, dismantling. of 20 hp 440 volt,50c/s, star delta, 3phase vt motor by supplying supperenameled copperwireandthentapping,varnishing, heating & testing on lull load and repairing of stator and rotor with including the deduction of cost of burnt copper wire approx. 18.5 kg.with changing of following bearing: (i) ball bearing as per sample 01 no. and (ii) thrust bearing as per sample (skf make) at raw water p/plant. 15 cost towards transportation charges of above pump motor set and other linings materials from p/plant to workshop and vice versa. 16 supplying and laying of 25 sq. mm x 3 core x 1.1 kv grade with isi mark pvc insulated and unarmoured flexible copper cable from mcp to motor terminal box with suitable copper thumble socket etc. 17 s/f of 90 watt ledfloodlighting luminaire with pressure die cast housing and toughened glass cover, operating voltage range 100v 270v ac with structure,stand, clamp, tee, wires and switches etc. all completeincluding repairing of lighting arrangements inside and outside of pump house at raw water p/plant. 18 costtowardssupplying andfitting of lighteningarrester suitable for building protection with earthingelectrode ,earthing compound, copper wires and earth work etc. all complete job. 19 cost towards replacement of old panel by supply installation & commissioning of new standing type floor mounting industrial panel board comprising 200 amp copper bus bar nos. in m.s steel(14swg) housing.•200 amp t.p.n mccb make l&t as incomer feeder.• 100 amp t.p.n mccb make l&t 2 nos as outgoing feeder.• ammeter digital ammeter with selector switch l&t/c&s make• voltmeter degital voltmeter in 3 phase ryb• indicating lamp led l&t/siemens/c&s make in red, yellow and blue colour 1 set.• 32 amp mcb for light load and other loads of l&t /havel’s/c&s make (2 no.)• fasd starter (make l&t) suitable for above pump set. panel should be dully painted with two coats super enameled paint of approved color one coat of red oxide primer and internally wired with suitable size of copper wire etc. all complete. 20 cost towards supplying triple spur gear type chain pully block of 3 tonne capacity with 6m lift complete with load chain and hand chain suitable for above lift, tested to 50%over load as per is 3832 carrying isi mark with travelling trolley etc. 21 cost towards of changeover switch tpn on load with sheet sheel enclosure capacity amp for by pass arrangement of servo voltage stabilizer make c&s havell s/l&t with all labour & tools and materials. 22 cost towards supplying and laying of 3core 95 sq.mm aluminium armoured cable from transformer to mcp 23 cost towards supplying installation and commissioning of 63 kva servo controlled (oil cooled) automatic voltage stabilizer suitable for output voltage of 415 + 1% 3 phase, 50 hz with copper wound transformer as mentioned below. the stabilizer shall function satisfactorily even if incoming supply is unbalanced between phases within range of 10%.the stabilizer should be constructed in cubical box,with bidirectional wheels for easy handling necessary monitors and user’s controls on front panel such as inducation alarm, voltmeter and selector switch for measuring input and output voltage auto manual selector switch.raise low push buttons etc. suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided .all three phases shall be independently monitored and corrected following protections and indication shall be incorporated as per is:9815a) over voltage/under voltageb)single phasing c) cut off contactorwith electronic output sensing unit d) suitable change over switch and earthing 100 kva oil cooled servo controlled automatic voltage stabilizer (output 415 unit+ 1%) input 280 to 450 volt. make: powerline/servokon ...

Indian Army - Jharkhand

35472974 bids are invited for ord store insulation tape , qucik fix , voltmeter , frequency meter , ammeter , stop solnoid total quantity : 35...

Central Coalfields Limited - Jharkhand

35267572 providing and installation of programmable energy meter, under voltage and over voltage relays, digital ammeter and voltmeter for different panels installed at 2 x 12.5 mva, 33kv / 6.6kv main substation of rajrappa project...

Central Coalfields Limited - Jharkhand

34880907 bids are invited for spares for electroteknica make flp transwitch isolator 3.3kv 400a on off , isolator moving contact , isolator fixed contact , core balance current transformer ht side , 3.3 kv grade epoxy resin cast pt ratio 3.3kv, 110v , 3.3kv pt fuse 3 amps , 2.5 round flush type ammeter 0 400 200a , 2.5 round flush type voltmeter , base mounted elr , relay for intrinsically safe circuit , indicating lamp led 12vac , aux. contactor 110vac , limit switch , micro switch , elr 50 ma to 750ma total quantity : 52...

Bharat Sanchar Nigam Limited - Jharkhand

34865200 tender for breakdown maintenance of eii / c replacement of faulty and old tube light fittings , repairing of fans , rewiring and out door light at main te building , ranchi under ranchi ba replacement of following faulty electrical items by new one i / c testing etc complete as reqd. 2 a ) 20 watt led tube light batten type fitting 3 b ) 20 watt led tube light retrofit type 4 c ) retrofit type 20watt tube light fitting 5 d ) led bulb 9 watt 6 e ) 15 a socket 7 f ) 15 / 16 amp switch 8 g ) 5 amp switch 9 h ) 5 amp socket 10 i ) fan regulator 11 through checking of faulty tube lights , street light and wiring etc i / c detection of fault, disconnection of wiring , cleaning and fittings etc as per site required. 12 s / f of 50 watt street light led type fittingmade up of diacast housing with toughned glass and individual leds with secondary optics and ip66 / 65 protectionsuitable for 230 volts 50 hz connectioni / c gi pipe 40mm dia etc as reqd. ( m / shavels or ss make ) 13 s / f of 100watt flood light led type fittingmade up of diacast housing with toughned glass and individual leds with secondary optics and ip66 / 65 protectionsuitable for 230 volts 50 hz connectioni / c gi pipe 40mm dia etc as reqd. ( havels or ss make ) 14 supply and installation of ceiling fan of 1200mm sweep , 50 watt, min 370 rpm, min. air delivery 215cmmsuitable for 230v , 50hz power supply as per site reqd. ( cropmton entrust 50 or ss make ) 15 repairing / rewinding / servicing of faulty ceiling / wallmounted / exhust fans i / c testing, commissioning etc as reqd. 16 a ) 1200 / 1400 mm ceiling / wall mounted fan 17 wiring for circuit / submain wiring alongwith earth wire with the following sizes of frls pvc insulated copper conductor, single core cable in surface / recessed steel conduit as required. 18 2 x 1.5 sq. mm + 1 x 1.5 sq. mm earth wire 19 2 x 6 sq. mm + 1 x 6 sq. mm earth wire 20 supplying and drawing following sizes of frls pvc insulated copper conductor, single core cable in the existing surface / recessed steel / pvc conduit as required. 21 2 x 1.5 sq. mm 22 3 x 1.5 sq. mm 23 3 x 4 sq. mm 24 6 x 4 sq. mm 25 supplying and fixing 5 a to 32 a rating, 240 / 415 v, 10 ka, “c” curve, miniature circuit breaker suitable for inductive load of following poles in the existing mcb db complete with connections, testing and commissioning etc. as required. 26 single pole 27 wiring for circuit / submain wiring alongwith earth wire with the following sizes of frls pvc insulated copper conductor, single core cable in surface / recessed medium class pvc conduit as required. 28 2 x 2.5 sq. mm + 1 x 2.5 sq. mm earth wire 29 4 x 2.5 sq. mm + 2 x 2.5 sq. mm earth wire 30 replacement of control panel for 5 hp submersible pump making 16 guage ms sheet i / c starter, voltmeter, ammeter, selector switch and short cicuit protection etc as reqd. ( make: bch cat cpeynajn or similar superior make ) 31 supplying and fixing following way, single pole and neutral, sheet steel, mcb distribution board, 240 v, on surface / recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. ( but without mcb / rccb / isolator ) 32 8 way , double door 33 supplying and fixing following rating, double pole, 240 v, isolator in the existing mcb db complete with connections, testing and commissioning etc. as required. 34 40 a 35 63 a 36 supplying and fixing brass batten / angle holder including connection etc. as required....

South Eastern Railways - Jharkhand

34311165 supply of voltmeter range 0 150 dc volts, voltmeter range 0 150 dc volts, , 72 x 72 mm analogue type front panel voltmeter range 0 150 dc volts, flush type with rubber gasket accuracy class 1.5 as per is:1248 ( p 2 ) 2003, nw 72, suitable for lhb ac coaches as per specification no. rdso / pe / spec / d / 0184 2015 ( rev 1 ) make ae nw72, muller, zeigler, rishabh l&t , yokins....

Hindustan Urvarak and Rasayan Limited - Jharkhand

34163378 supply and installation of low voltage switchboard at hurl sindri project supply and installation of low voltage switchboard at hurl sindri project , supply, loading, handling, storage, transportation within site, erection, installation, testing and commissioning etc. of following lt panel , 415 v, 3 ph. & n, ip54, floor mounted sheet steel enclosed main power board with al bus bar of 250a which consists of 2 nos. incoming 4p, 250 a, 50ka mccb incomer with earthfault, overcurrent protection and mechanical interlock with 250 / 1 ct, mfm, voltmeter, vss & ryb indications & 8nos. 63 a tpn rccb outgoing feeders indications & 7 nos. 63 a tpn sfu outgoing feeders on indoor bus & 2 nos. 4p, 100a, 30ka mccb outgoing feeders on outdoor bus with timer controlled feeders with suitable power contactor to operate outdoor bus. , 415 v, 3 ph. & n, ip55, outdoor type, structural mounted, weatherproof ( ip 55 ) lighting distribution board type db with bus bar 200 a, 415v having 2 nos. tpn, incomer 3p, 100a, 30kamccb withvoltmeter, vss & ryb indications and6 nos. 63 a tpn rccboutgoing feeder circuit and 16a, dp mcb, 6nos. , 415 v, 3 ph. & n, ip54, floor mounted sheet steel enclosed main power board with al bus bar of 400a which consists of 2 nos. incoming [ 4p, 400a, 50ka mccb incomer and 4p, 250a, 50ka mccb ] incomer with earthfault, overcurrent protection and mechanical interlock with 400 / 1 ct& 250 / 1 ct, mfm, voltmeter, vss & ryb indications &10 nos. 100 a mccb outgoing feeders & 4 nos. 63 a tpn rccb outgoing feeders& 2nos. 3p, 36a sfuoutgoing feeders and 16a, dp mcb, 6nos. , 415 v, 3 ph. & n, ip54, floor mounted sheet steel enclosed main power board with al bus bar of 100a which consists of 2 nos. incoming 4p, 100 a, 30ka mccb incomerwith earthfault, overcurrent protection and mechanical interlock with 100 / 1 ct, mfm, voltmeter, vss & ryb indications & 63 a tpn rccb outgoing feeders& 2 nos. 3p, 63a sfuoutgoing feeders and 32a, dp mcb, 6nos. , 415 v, 3 ph. & n, ip54, floor mounted sheet steel enclosed main power board with al bus bar of 630a which consists of 2 nos. incoming 4p, 630 a, 50ka mccb incomer with earthfault, overcurrent protection and mechanical interlock with 630 / 1 ct, mfm, voltmeter, vss & ryb indications & 10 nos. 63 a tpn rccb outgoing feeders indications & 6 nos. 250 a tpn sfu outgoing feeders & 2 nos. 3p, 63a sfuoutgoing feeders and 32a, dp mcb, 6nos....

Uranium Corporation Of India Limited - Jharkhand

33697571 spares of 55 kw nflp gate end box spares of 55 kw nflp gate end box , spares of 55 kw nflp gate end box , pr pilot relay with base , heavy duty screw assy. complete with handle, bush, lock etc for 200 amps plug socket , dmc moulded plug insulation ( w.o.pin ) for 200 amps plug & socket , brass pin for plug ( set of 4 pins ) of 200 amps plug & socket , dmc moulded socket insulation ( w.o.pins ) for 200 amps plug & socket , brass pin for socket ( set of 4 pins ) of 200 amps plug & socket , 72 sq.mm ammeterrange : 0 300 900a ( w.o.ct ) , inter lock assy for isolator handle , auxiliary contactor 3no+1nc with 110v coil type ca2 dn1319 fitted with add on block la1d11 , 72 sq.mm voltmeter range: 0 500ac , contactor type tcla1 d22 with auxiliary contact 2no+2nc coil voltage 440v ac , metallic togle switch complete with chacker nut of any reputed make 2 way 10a 440v , earth leakage relay 50ma to 750ma with time delay 0.1sec to 1sec auxiliary voltage 12v ac , 200 amps plug and socket complete set with leads for socket , 200 amps socket complete set with ieads , single phase preventer aux. supply voltage 440v type vsp3 make : minilec , control transformer primary voltage 0 to 415v 440v 460v / secondary 0 to 8v 12v and 0 to 110v va 100va , limit switch for isolator , led indicating lampoperating voltage : 12v ac colour : red , led indicating lamp operating voltage : 12v ac colour: green , led indicating lamp operating voltage : 12v ac colour : yellow...

Central Coalfields Limited - Jharkhand

33566712 bids are invited for procurement of spares for electroteknica 1 nvcbv0001 shunt trip coil assembly 2 2 nvcbv0004 breaker charging handle 2 3 nvcbv0013 vacuum interrupter 1 4 nvcbv0014 96sq.mm ammeter upto 0 600 / 120a, ctr 600 / 5a 1 5 nvcbv0015 96sq.mm ammeter upto 0 300 / 600a, ctr 300 / 5a 1 6 nvcbv0017 96sq.mm voltmeter 0 5ka, ptr3.3kv / 110v ac 2 7 nvcbi0018 ammeter selector switch 2 8 nvcbi0019 voltmeter selectoe switch 2 9 nvcbi0020 mushroom head push button 2 10 nvcbp0032 tnc switch for elec.operated vcb 2 11 nvcbp0034 rectifier capacity unit 15a 2 12 nvcbp0035 earth leakage relay 1 13 nvcbp0037 3.3 kv / 110v12v, 100va / ph 3 ph pt 2 14 nvcbp0044 3.3 kv, 3 amps. p.t fuse 6 15 nvcbp0057 hrc fuse link 10 amps. 6 16 nvcbp0074 limit switch 2 17 ivb0001 shunt trip / series trip coil 2 18 ivb0003 auxillary switch assembly 1 19 ivb0021 breaker charging mechnism 2 20 ivb0022 catch mechanism 2 21 ivb0059 tpnd o / c & e / f relay with high set 2 22 ivb0040 11kv / 110v, 100va per phase 3 phase p.t 2 23 ivb0041 resin cast c.t class 5p 10 / class 1.0 3 24 ivb0068 master tripping relay 1 total quantity : 51...