Central Coalfields Limited - Jharkhand

40869075 repairing and thorough overhauling of vertical turbine pump of discharge 330 m3 hr 415v 5 stage make worthington and model c14tc with sl. no. 1al 6146 48 installed at intake cpp pump house under kathara colliery...

Bharat Coking Coal Limited - Jharkhand

40643122 complete repairing of 01 nos. of 6 stage, 125kw,330cum, 3ph,415v,71m head vertical submersible installed at intake well over damodar river of cpp, moonidih, wj area. sl.no. 3 repairing of 6stage,330cum,125kw, 3ph,415v, vertical turbine pump installed over damodar river of cpp, moonidih, wj area...

Bharat Coking Coal Limited - Jharkhand

40435659 complete rewinding and rotor repairing of 180hp, 550v motor utilised for operation of turbine pump at phularitand underground, amp colliery complete rewinding and rotor repairing of 180hp, 550v motor utilised for operation of turbine pump at phularitand underground, amp colliery...

Urban Development Department - Jharkhand

39240878 renovation work of electromechanical components of raw water p / plant ( intake well ) by supplying, installation, testing and commissioning of water lubricated vertical turbine pump set 01 set and 1000 kva automatic servo voltage stabliliser 01 no. and allied works at intake well baskichawk under nagar parishad, dumka...

Urban Development And Housing Department - Jharkhand

39212164 tender for renovation work of electromechanical components of raw water p/plant(intake well) by supplying, installation, testing and commissioning of water lubricated vertical turbine pump set 01 set and 1000kva automatic servo voltage stabliliser 01 no. and allied works at intake well baskichawk....

Bharat Coking Coal Limited - Jharkhand

39086684 complete repairing and overhauling of pl iii 5 stage m and p make turbine pump 1 no. for pumping having sl no. bccl / jg / pump / 1000 gpm / 02 of amal. nt st jg ocp under lodna area....

Central Coalfields Limited - Jharkhand

38519241 repair and overhaul of vertical turbine pump set, 1000 gpm, 07 stage, 140 mtr head installed at iwss / ccd unit of dhori area, m/c sl.no 1530791013...

Central Coalfields Limited - Jharkhand

38518046 tender for repair and overhaul of vertical turbine pump set, 1000 gpm, 07 stage, 140 mtr head installed at iwss / ccd unit of dhori area, m/c sl.no 1530791013...

Drinking Water And Sanitation Department - Jharkhand

37695394 supply installation testing and commissioning of pump sets, motor control panel, stabilizer and its allied works at bagodih multi village rural water supply scheme at bagodih ( a ) raw water pumping plant 1.01 supplying all labour tools and tackles for taking out old and damaged vt pump sets from intake well with all accessories , demolition of mounting channel for installation of new vertical turbine pump sets. 1.02 supplying, installation, testing and commissioning of electrically driven vertical turbine pump sets kirloskar / wpil / mather & plate / jyoti having discharge capacity of raw water 90 m3 / h against a total head of 75 meter, in all concern coupled with vertical hollow shaft sq. cage induction motor make ( kirloskar / crompton / jyoti / abb ) , operated on 415 + 10% volts, 50hz, 1460 rpm ( 10% above the capacity of pump ) with sole plate, discharge head, m.s. d.f. column assembly random length of 5 ft, total 60 ft. s.s. line shaft, s.s, socket, spider bearing with rubber cut less bush, cidf sluive valve 1 no, cidf nr valve 1 no, pressure gauge 1 no ets all complete. 1.03 supplying all labour tools and tackles for making pcc foundation 2′x2′x1′ with all materials such as cement , sand, stone chips, foundation bolt etc all complete including fixing of sole plate for installation of new vt pump sets 1.04 providing floor / wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated consisting of: proper distribution 200 amp copper bus bar 4 pole 1 set micro processor base tpn mccb 200 amp l&t / siemens make with earth fault relay for incoming feeder – 1no. mccb 160 amp tp l&t / siemens / bch / schneider make for outgoing feeder 2 nos ( 1no for each pump sets ) , 32a dp mcb for lighting 1 no., suitable size of fully automatic star delta starter l&t / bch / schnider / havells make 2 nos., ( 1no for each pump sets ) 0 500 v voltmeter with selector switch 1 set, ct operated ampere meter ( 0 120a ) with ct 2 sets, phase indicating neon lamp 6nos, s.p.p. 2nos , doing internal wiring with proper gauge of copper wire etc all complete job and testing on load. 1.05 cost towards supplying and laying of 16mm2 x , 3 core pvc insulated and pvc sheathed , 1.1 kv grade unarmored copper cable of reputed make and isi marked doing connection from panel to both motor. jsor dwsd 2021 1.06 cost towards making cable mouth for 16mm2 1.07 cost of doing internal light wiring of pump house with 7 / 18 single core copper wire will all required making short point 1 no, medium point 4 nos, long point 1 no with supplying and fixing 4′x40 watt tube light 3 nos, 25 watt, led flood light with bracket 1 no etc all complete. 1.08 earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 1.09 supplying and laying of 8 swg copper / gi wire for making earthing connection in two from earthing station to panel to motor . 1.10 supplying and fixing 3 ton capacity triple gear chain pulley block with 6 meter lifting chain of reputed make and isi marked. 1.11 supplying 75 kva servo controlled voltage stabilizer suitable for input voltage 280 480 volts, output voltage of 400 volt±1%, 3 ph, 50 hz, with copper wound transformer ( oil cooled ) , unbalanced type, air cooled / oil cooled, three phase, frequency : 50 hz. speed of correction : 35v / second. regulation : + 1% from no load to full load.ambient temperature : 0 to 55 degree centigrade ( designed for indoor / outdoor continuous operation. operation : automatic cum manual, mcb for short circuit & over load protection, high volt low volt indicator & volt meter with all necessary switches and indicator the stabilizer shall function satisfactory even if incoming supply is unbalanced between phases within range of 10%. the stabilizer should be constructed in cubical box with bidirectional wheels for easy handling, necessary monitors and user’s controls on front panel such as indication, alarm, volt meter and selector switch for measuring input and output voltage, auto / manual selector switch, raise / low push button etc. suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. all three phases shall independently monitored and corrected. make – powerline / servokon 1.12 supplying and fitting 200 amp changeover switch. make – havell’s / hpl 1.13 supplying and filling transformer oil. 1.14 supplying and laying 120 sq. mm x 3.5 core pvc sheathed & pvc insulated, 1.1 kv grade aluminum unarmoured cable. make – polycab / kei / universal / isi 1.15 cost for supplying and laying delivery pipe line with s / f of 4dia heavy duty gi pipe 5, flange 5nos., rubber insertion 5kg, nut bolt 8kg, with cutting of pipe in required size and welding with all labour tools and tackles. ( b ) clear water pumping plant 1.16 supplying all labour tools and tackles for taking out old and damaged c / f pump set with all accessories , demolition of foundation for installation of new hsc centrifugal pump sets. 1.18 supplying, installation, testing and commissioning of electrically driven horizontal split casing centrifugal pump set make ( kirloskar / wpil / mather & plate / jyoti ) having discharge capacity of clear water 90 m3 / h against total head of 30 meter coupled with tefc sq. cage induction motor make ( kriloskar / crompton / jyoti / abb ) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with cidf sluice valve 1 no, cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tyre coupling 1 set etc all complete. 1.19 supplying all labour tools and tackles for making pcc foundtiaon 1nos, of size 6′x3x3′ with all materials such as cement , sand, stone chips, foundation bolt 6nos etc all complete and plastering and punning over exposed surface. 1.20 cost for supply and laying of suction pipe line with s / f of 6 dia heavy duty g.i. pipe 6m, bend 2 nos., flange 6 nos., nut, bolt, washer 10kg, rubber insertion etc, cutting of pipe in required size and doing complete welding work including all labour, tools, tackle and technician charges.with cp & ohc. ( rate after deducting the scrap materials. ) 1.21 providing floor / wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – proper distribution 100 amp copper bus bar 4 pole 1 set micro processor base tpn mccb 100 amp l&t / siemens make with earth fault relay for incoming feeder – 1no. mccb 63 amp tp l&t / siemens make for outgoing feeder 2 nos. ( 1no for each pump sets ) suitable size of fully automatic star delta starter l & t / bch / schnider make 2 nos. 0 500 v voltmeter with selector switch 2nos ct operated ampere meter 0 100a ) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wire etc all complete job and testing on load. 1.22 cost towards supplying and laying of 10 mm2 , 3 core pvc insulated and pvc sheathed, 1.1 kv grade unarmered copper cable of reputed make and isi marked for doing connection from panel to motor. jsor dwsd 2021 1.23 cost towards making cable mouth for 10mm2 1.24 cost of doing internal light wiring of pump house with 7 / 18 single core copper wire will all required making short point 1 no, medium point 4 nos, long point 1 no with supplying and fixing 4′x40 watt tube light 3 nos, 25 watt, led flood light with bracket 1 no etc all complete. 1.25 cost for doing chemical earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 1.26 supplying and laying of 8 swg copper / gi wire for making earthing connection in to from earthing station to panel to motor . 1.27 cost for supplying and laying delivery pipe line with s / f of 4dia heavy duty gi pipe 5, flange 5nos., rubber insertion 5kg, nut bolt 8kg, with cutting of pipe in required size and welding with all labour tools and tackles. 2 supply, installation, testing and commissioning of 1no v.t. pump set at raw water pumping plant and 1 no h.s.c. pump set at clear water pumping plant and its allied works at rural water supply scheme, dumri ( a ) raw water pumping plant, dumri 2.01 supplying all labour tools and tackles for taking out old and damaged vt pump sets from intake well with all accessories , demolition of mounting channel for installation of new vertical turbine pump sets. 2.02 cost towards supplying, installation and commissioning of vertical turbine water lubricated single / multi stage pump set of kirlosker / jyoti / mather & platt / wpil make capable of discharge 36.55 lps against total head 36 m, with suitable discharge head base plate and accessories such as m.s. column pipe of suitable dia, flange type 40ft ( 5ft length 7nos and 2.5ft 2nos ) , line shaft , spider bearing with rubber cutless bush for 40ft column assembly, coupled with suitable capacity vertical hollow shaft squirrel cage tefc induction motor of kirlosker / jyoti / cgl / abb / bhel make , operated on 415±10% volt , 3 phase, 50 c / s, a.c. supply having 1450 rpm , with non reversible rachet, including cost of supplying fitting and fixing of all required accessories such as strainer, sluice valve, n.r. valve, pressure gauge etc all complete. 2.03 cost for supply and fitting of ml3 starter of l&t make. 2.04 cost for breaking of old pcc foundation and making new pcc foundation size ( 600mm x 600mm x 400mm ) with supply and fitting of 5 / 8 inch dia x 300mm long foundation bolt 4nos, stone chips, sand, cement etc and plastering and punning of exposed surface etc all complete 2.05 cost for supplying and laying of 3core 10 sq. mm, copper cable unarmoured, p.v.c insulated and p.v.c. sheathed 1100 v grade with isi mark from motor to starter in 2 length each for both motor. 2.06 cost for doing socketing of 3 core 10 sqmm cable, with supplyu and fiotting of copper lugs with all required insulating materials. 2.07 supplying 50 kva servo controlled voltage stabilizer suitable for input voltage 280 480 volts, output voltage of 400 volt±1%, 3 ph, 50 hz, with copper wound transformer ( oil cooled ) , unbalanced type, oil cooled, three phase, frequency : 50 hz. speed of correction : 35v / second. regulation : + 1% from no load to full load.ambient temperature : 0 to 55 degree centigrade ( designed for indoor / outdoor continuous operation. operation : automatic cum manual, mcb for short circuit & over load protection, high volt low volt indicator & volt meter with all necessary switches and indicator the stabilizer shall function satisfactory even if incoming supply is unbalanced between phases within range of 10%. the stabilizer should be constructed in cubical box with bidirectional wheels for easy handling, necessary monitors and user’s controls on front panel such as indication, alarm, volt meter and selector switch for measuring input and output voltage, auto / manual selector switch, raise / low push button etc. suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. all three phases shall independently monitored and corrected. make – powerline / servokon 2.08 supplying and fitting 200 amp changeover switch. make – havell’s / hpl 2.09 supplying and filling transformer oil. 2.10 supplying and laying 70 sq. mm x 3.5 core pvc sheathed & pvc insulated, 1.1 kv grade aluminium unarmoured cable. make – polycab / kei / universal / isi 2.11 cost of doing internal light wiring of pump house with 7 / 20 single core copper wire will all required making short point 1 no, medium point 4 nos, long point 1 no with supplying and fixing 4′x40 watt tube light 3 nos, 25 watt, led flood light with bracket 1 no etc all complete. 2.12 supplyng and fitting of 150 mm dia cidf sluice valve with nut bolts washer insersation rubber with all labour tool, tackles and technician charges etc. all complete job ( b ) clear water pumping plant, dumri 2.13 cost towards supplying of hsc c / f pump capable for discharging 36 lps against total head 45 m ( make: kirloskar / crompton greese / jyoti / mather & platt / wpil ) coupled with sutibale size of squirell cage 3 phase induction motor ( make: kirloskar / crompton greaves / jyoti / abb / bhel ) operated on 415v, 50c / s, 1450rpm fitted on common channel fabricated base plate with required size of heavy duty , sluice valve 1no., n.r. valve 1no, pressure guage 1no., etc all complete. 2.14 cost towards dismantling of old 25hp c / f pump motor from base plate by gas cutter, cost for breaking of old existing foundation and removing of all garbage from pump house with all labour tools, tackles and technician cost. making new pcc foundation for above centrifugal pump set of casting of new pcc foundation of size 5 x 3 x 3 deep with s / f of 5 / 8 x 3 long foundation bolt 6nos, cement, sand, stone chips and plastering and punning of exposed surface etc all complete. 2.15 cost for supplying and laying of 3core 10 sq. mm, copper cable unarmoured, p.v.c insulated and p.v.c. sheathed 1100 v grade with isi mark from motor to starter in 2 length each for both motor. 2.16 cost for making and fitting of 6 dia common header with s / f of 6dia heavy duty gi pipe 6mtr, 6dia bend 2nos, 6 dia flange 10nos, rubber insertion 15kg. nut+bolt+washer 16kg, cutting of pipe in require length and duing complete welding etc all complete with all labour tools and tackles. 2.17 cost towards consumable materials such as grease, gland packing, insertion rubber, nut bolt, jute, logbook, , led bulb, broom etc. 2.18 cost for doing socketing of 3 core 10 sqmm cable, with supplyu and fiotting of copper lugs with all required insulating materials. 2.19 supplying 50 kva servo controlled voltage stabilizer suitable for input voltage 280 480 volts, output voltage of 400 volt±1%, 3 ph, 50 hz, with copper wound transformer ( oil cooled ) , unbalanced type, air cooled / oil cooled, three phase, frequency : 50 hz. speed of correction : 35v / second. regulation : + 1% from no load to full load.ambient temperature : 0 to 55 degree centigrade ( designed for indoor / outdoor continuous operation. operation : automatic cum manual, mcb for short circuit & over load protection, high volt low volt indicator & volt meter with all necessary switches and indicator the stabilizer shall function satisfactory even if incoming supply is unbalanced between phases within range of 10%. the stabilizer should be constructed in cubical box with bidirectional wheels for easy handling, necessary monitors and user’s controls on front panel such as indication, alarm, volt meter and selector switch for measuring input and output voltage, auto / manual selector switch, raise / low push button etc. suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. all three phases shall independently monitored and corrected. make – powerline / servokon 2.20 supplying and fitting 200 amp changeover switch. make – havell’s / hpl 2.21 supplying and filling transformer oil. 2.22 supplying and laying 70 sq. mm x 3.5 core pvc sheathed & pvc insulated, 1.1 kv grade aluminium unarmoured cable. make – polycab / kei / universal / isi 2.23 cost of doing internal light wiring of pump house with 7 / 20 single core copper wire will all required making short point 1 no, medium point 4 nos, long point 1 no with supplying and fixing 4′x40 watt tube light 3 nos, 25 watt, led flood light with bracket 1 no etc all complete. 2.24 supplyng and fitting of 300 mm dia cidf sluice valve with nut bolts washer insersation rubber with all labour tool, tackles and technician charges etc. all complete job 2.25 cost towards supplying of hsc c / f pump capable for discharging 36 lps against total head 45 m ( make: kirloskar / crompton greese / jyoti / mather & platt / wpil ) coupled with sutibale size of squirell cage 3 phase induction motor ( make: kirloskar / crompton greaves / jyoti / abb / bhel ) operated on 415v, 50c / s, 1450rpm fitted on common channel fabricated base plate with required size of heavy duty , sluice valve 1no., n.r. valve 1no, pressure guage 1no., etc all complete. 3 supply installation testing and commissioning of pump sets, motor control panel, stabilizer and its allied works at bharkatta multi village rural water supply scheme at bharkatta ( a ) raw water pumping plant: 3.01 supplying all labour tools and tackles for taking out old and damaged vt pump sets from intake well with all accessories , demolition of mounting channel for installation of new vertical turbine pump sets. 3.02 supplying, installation, testing and commissioning of electrically driven water lubricated vertical turbine pump sets kirloskar / wpil / mather & plate / jyoti having discharge capacity of raw water 114 m3 / h against a total head of 39 meter, in all concern coupled with vertical hollow shaft sq. cage induction motor make ( kirloskar / crompton / jyoti / abb ) , operated on 415 + 10% volts, 50hz, 1460 rpm ( 10% above the capacity of pump ) with sole plate, discharge head, m.s. d.f. column assembly random length of 5 ft, total 45 ft. s.s. line shaft, s.s, socket, spider bearing with rubber cut less bush, cidf sluice valve 1 no, cidf nr valve 1 no, pressure gauge 1 no ets all complete. 3.03 supplying all labour tools and tackles for braking old pcc and making new pcc foundation 2′x2′x1′ with all materials such as cement , sand, stone chips, foundation bolt etc all complete including fixing of sole plate for installation of new vt pump sets 3.04 providing floor / wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated consisting of: proper distribution 200 amp copper bus bar 4 pole 1 set micro processor base tpn mccb 200 amp l&t / siemens make with earth fault relay for incoming feeder – 1no. mccb 100 amp tp l&t / siemens / bch / schneider make for outgoing feeder 2 nos ( 1no for each pump sets ) , 32a dp mcb for lighting 1 no. suitable size of fully automatic star delta starter l&t / bch / schnider / havells make 2nos. ( 1no for each pump sets ) 0 500 v voltmeter with selector switch 1 set ct operated ampere meter ( 0 120a ) with ct 2 sets, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wire etc all complete job and testing on load. 3.05 cost towards supplying and laying of 16mm2 x , 3 core pvc insulated and pvc sheathed , 1.1 kv grade unarmored copper cable of reputed make and isi marked doing connection from panel to both motor. jsor dwsd 2021 3.06 cost towards making cable mouth for 16mm2 3.07 cost of doing internal light wiring of pump house with 7 / 18 single core copper wire will all required making short point 1 no, medium point 4 nos, long point 1 no with supplying and fixing 4′x40 watt tube light 3 nos, 25 watt, led flood light with bracket 1 no etc all complete. 3.08 earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 3.09 supplying and laying of 8 swg copper / gi wire for making earthing connection in two from earthing station to panel to motor . 3.10 supplying and fixing 3 ton capacity triple gear chain pulley block with 6 meter lifting chain of reputed make and isi marked. 3.11 supplying 50 kva servo controlled voltage stabilizer suitable for input voltage 240 480 volts, output voltage of 400 volt±1%, 3 ph, 50 hz, with copper wound transformer ( oil cooled ) , unbalanced type, oil cooled, three phase, frequency : 50 hz. speed of correction : 35v / second. regulation : + 1% from no load to full load.ambient temperature : 0 to 55 degree centigrade ( designed for indoor / outdoor continuous operation. operation : automatic cum manual, mcb for short circuit & over load protection, high volt low volt indicator & volt meter with all necessary switches and indicator the stabilizer shall function satisfactory even if incoming supply is unbalanced between phases within range of 10%. the stabilizer should be constructed in cubical box with bidirectional wheels for easy handling, necessary monitors and user’s controls on front panel such as indication, alarm, volt meter and selector switch for measuring input and output voltage, auto / manual selector switch, raise / low push button etc. suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. all three phases shall independently monitored and corrected. make – powerline / servokon. 3.12 supplying and laying 50 sq. mm x 3.5 core pvc sheathed & pvc insulated, 1.1 kv grade aluminium unarmoured cable. make – polycab / kei / universal / isi 3.13 supplying and fitting 200 amp changeover switch. make – havell’s / hpl 3.14 supplying and filling transformer oil. 3.15 cost for supplying and laying delivery pipe line with s / f of 4dia heavy duty gi pipe 5, flange 5nos., rubber insertion 5kg, nut bolt 8kg, with cutting of pipe in required size and welding with all labour tools and tackles. 3.16 cost towards supplying and laying of 16mm2 x , 3 core pvc insulated and pvc sheathed , 1.1 kv grade unarmored copper cable of reputed make and isi marked doing connection from panel to both motor. jsor dwsd 2021 ( b ) clear water pumping plant: 3.17 supplying all labour tools and tackles for taking out old and damaged c / f pump set with all accessories , demolition of foundation for installation of new hsc centrifugal pump sets. 3.18 supplying, installation, testing and commissioning of electrically driven horizontal split casing centrifugal pump set make ( kirloskar / wpil / mather & plate / jyoti ) having discharge capacity of clear water 114 m3 / h against total head of 37 meter coupled with tefc sq. cage induction motor make ( kriloskar / crompton / jyoti / abb ) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with cidf sluice valve 1 no, cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tyre coupling 1 set etc all complete. 3.19 supplying all labour tools and tackles forbreaking old pcc and making new pcc foundtiaon 1nos, of size 6′x3x3′ with all materials such as cement , sand, stone chips, foundation bolt 6nos etc all complete and plastering and punning over exposed surface. 3.20 cost for supply and laying of suction pipe line with s / f of 6 or suitable dia heavy duty g.i. pipe 6m, bend 2 nos., flange 6 nos., nut, bolt, washer 10kg, rubber insertion etc, cutting of pipe in required size and doing complete welding work including all labour, tools, tackle and technician charges.with cp & ohc. ( rate after deducting the scrap materials. ) 3.21 providing floor / wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated consisting of: proper distribution 200 amp copper bus bar 4 pole 1 set micro processor base tpn mccb 200 amp l&t / siemens make with earth fault relay for incoming feeder – 1no. mccb 100 amp tp l&t / siemens / bch / schneider make for outgoing feeder 2 nos ( 1no for each pump sets ) , 32a dp mcb for lighting 1 no. suitable size of fully automatic star delta starter l&t / bch / schnider / havells make 2 nos. ( 1no for each pump sets ) 0 500 v voltmeter with selector switch 1 set ct operated ampere meter ( 0 120a ) with ct 2 sets, phase indicating neon lamp 6nos s.p.p. 2nos doing internal wiring with proper gauge of copper wire etc all complete job and testing on load. 3.22 cost towards supplying and laying of 10 mm2 , 3 core pvc insulated and pvc sheathed, 1.1 kv grade unarmered copper cable of reputed make and isi marked for doing connection from panel to motor. jsor dwsd 2021 3.23 cost towards making cable mouth for 10mm2 3.24 cost of doing internal light wiring of pump house with 7 / 20 single core copper wire will all required making short point 1 no, medium point 4 nos, long point 1 no with supplying and fixing 4′x40 watt tube light 3 nos, 25 watt, led flood light with bracket 1 no etc all complete. 3.25 cost for doing chemical earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 3.26 supplying and laying of 8 swg copper / gi wire for making earthing connection in to from earthing station to panel to motor . 3.27 cost for supplying and laying delivery pipe line with s / f of 4dia heavy duty gi pipe 3, flange 5nos., rubber insertion 5kg, nut bolt 8kg, t 01 no. with cutting of pipe in required size and welding with all labour tools and tackles. 3.28 supplying and fitting 200 amp changeover switch. make – havell’s / hpl...

Central Coalfields Limited - Jharkhand

37060164 repairing and providing of nrv (non return valve) of vertical turbine pump no. 01 and 03, repairing of its delivery line and repairing and changing of sluice valve at intake cpp pump house under kathara colliery...

Central Coalfields Limited - Jharkhand

37059771 tender for repairing and providing of nrv (non return valve) of vertical turbine pump no. 01 and 03, repairing of its delivery line and repairing and changing of sluice valve at intake cpp pump house under kathara colliery....

Drinking Water And Sanitation Department - Jharkhand

37002062 tender for supplying installation, testing and commissioning of 2 nos. vertical turbine pump sets with all associated works at raw water pumping plant, gondaunder d.w. & s. mechanical division, ranchi...

Drinking Water And Sanitation Department - Jharkhand

36990274 for supplying, installation, testing and commissioning of 2 set of new 175 hp vt pump sets, motor control panel and its allied work at raw water pumping plant , multi panchayat rural water supply scheme madhuban pirtand , v.t. pump set: , supplying, installation, testing and commissioning of water lubricated vertical turbine pump [ make: kirloskar / mather & platt / jyoti / wpil ] capable of discharging 45 lps raw water against a total head of 185 meter at speed not more than 1500 rpm as per is: 1710 / 1989 with column length not less than 50 ft in 5ft eachwith closed type ss impeller, ss line shaft, ss shaft sleeves, flanged type ms column pipes suitable for below the floor installation and existing delivery header coupled with verticalhollow shaft operated on 415v±10%, 3 phase, ac, 50±5%hz, 4 pole, duty s1, insulation f, lt squirrel cage induction motor with suitable size of coupling as per latest is specification [ make: abb / bhel / crompton / marathon / jyoti / kirloskar ] having 10% more bhp than the pump, making alignment, making electrical connections, with all required tools, tackles, consumables as required, testing and commissioning on full load as per the direction of e / i. etc all complete. , cost towards dismantling, lifting of old 175 hp pump sets with all 200 mm dia column pipes from intake well and loweringnew pump sets with all accessories along with all labour tools and tackles etc all complete. , cost towards breaking of old pcc foundation and removing of all garbage from pump house to out side with lead of 300 m with all labour tools and tackles etc all complete. , cost towards making of newpccfoundation sizing 3 x 3 x 1 with supplying and fitting of foundation bolt 4nos., cement, sand , stone chips, as required and plastering and punnning over exposed surface etc with materials, all labour tools and tackles etc all complete. , cost towards supply and laying of 3c x 95 sq. mm copper cable, pvc insulated & pvc sheathed, 1100v grade, isi marked, make.havells / polycab / finolex / gemscab / any reputed make for 3 pump sets , socketing of terminal ends with s / f of terminal socket including all labour , tools and tackles. 3 core x 95mm2, copper cable 12 ends. , cost towards supplying and fixing 5 ton capacity, triple spur gear type chain pulley block suitable for capacity as below with 6 meter lift complete with load chain and hand chain suitable for above lift , tested to 50% over load as per is 3832 carryingisi mark with travelling trolley etc. , providing floor mounted cubical l.tmotor control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – ( a ) incoming: ( i ) proper distribution 800 amp copper bus bar 4 pole 1 set ( ii ) mccb 800 amp. acb, make l&t / siemens for incoming feeder 1no. ( iii ) 0 500 v voltmeter 1no. with selector switch 1 no, ct operated ampere meter ( 0 500a ) 1no. selector switch 1 no, phase indicating neon lamp 3 nos. ( b ) outgoing: ( i ) mccb 630 amp. tpn type, make l&t / siemens for outgoing feeder 3 nos. ( 01 no for each pump set ) ( ii ) suitable size of fasd starter l&t / bch / schneider make 3 nos. ( iii ) 0 500 v voltmeter 3nos. with selector switch 3 nos, ct operated ampere meter ( 0 500a ) 3nos. selector switch 3 nos, phase indicating neon lamp 9 nos, single phase preventor 3 nos., doing internal wiring with proper gauge of copper wire etc all complete job with testing on full load....

Drinking Water And Sanitation Department - Jharkhand

36990246 renovation of rural water supply scheme at khudgaddha , raw water pumping plant: , supplying all labor tools and tackles for taking out old and damaged vt pump sets from intake well with all accessories , demolition of mounting channel for installation of new vertical turbine pump sets. , supplying, installation, testing and commissioning of electrically driven vertical turbine pump sets kirloskar / wpil / mather & plate / jyoti having discharge capacity of raw water127 m3 / hragainsttotal head of 65 meters, coupled with vertical hollow shaft sq. cage induction motor make ( kirloskar / crompton / jyoti ) operated on 415 + 10% volts, 50hz, 1470 rpm with sole plate, discharge head, m.s. d.f. column assembly random length of 5 ft, total 40 ft. s.s. line shaft, s.s, socket, spider bearing with rubber cut less bush, cidf sluice valve 1 no, cidf nr valve 1 no, pressure gauge 1 no ets all complete. note: motor capacity should have 10% above of the pump. , supplying all labor tools and tackles for making pcc foundation 3x3x1 with all materials such as cement , sand, stone chips, foundation bolt, reducer as per sample, including fixing of sole plate for installation of new vt pump sets and jointing the existing delivery pipe line etc all complete job. , cost towards supplying andlaying of 16mm2 x3 core pvc insulated and pvc sheathed , 1.1 kv grade unarmored copper cable of reputed make and isi marked doing connection from panel to both motor. , cost towards making cable mouth for ( a ) 95 mm2 16 nos , ( b ) 16mm2 24nos , cost of doing internal light wiring of pump house with 7 / 18 single core copper wire will all required making short point 1 no, medium point 2 nos, long point 1 no with supplying and fixing 4x40 watt tube light 2 nos, 25 watt, led flood light with bracket 1 no etc all complete , earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 02 nos. for pump set and 02 nos. for transformer ( one body earthing and one neutral earthing ) , cost for supply and fitting of 200amp. tpn main switch / switch disconnectorand doing all line connection. , supplying and laying of 8 swg copper wire for making earthing connection in to from earthing station to panel to motor . , cost towards supplying andlaying of 95 mm2 , 3 ½ core pvc insulated and pvc sheathed , 1.1 kv grade armeredaluminum cable of reputed make and isi marked doing connection from main switch to stabilizer andstabilizer to panel . , providing floor / wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – ( a ) proper distribution 200 amp copper bus bar 4 pole 1 set ( b ) tpn mccb 250 amp l&t / siemens make withearth faultrelay for incoming feeder – 1no. ( c ) mccb 100 amp tp l&t / siemens make for outgoing feeder 2 nos. ( 1no for each pump sets ) ( d ) suitable size of fully automatic star delta starter l & t / bch / schnider make 2 nos. ( e ) with suitable kvr ( capacitor ) for improving power factor ( f ) 0 500 v voltmeter with selector switch 2nosct operated ampere meter ( 0 200a ) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wireetc all complete job and testing on load. , costtowards repairing and complete overhauling of 125 kva servo controlled automatic voltage stabilizer, disconnectingall electric line and joints and checking defects and removing them by s / f of damaged spare parts such as 10 kg operating motor 02 nos , connecting jack 03 nos, r c unite – 02 nos , variac auto transformer 01 no, control card 03 nos and doing internalwiring in propergauge of wire and reassembling the same and test on full load , including tools tackles and labor charges. , supply and top up transformer oil of reputed make , clear water pumping plant: , supplying all labour tools and tackles for taking out old and damaged c / f pump set with all accessories , demolition of foundationfor installation of new hsc centrifugal pump sets. , supplying, installation, testing and commissioning of electrically drivenhorizontal split casing centrifugalpump set make ( kirloskar / wpil / mather& plate / jyoti ) having discharge capacity of clear water33.5 lps againsttotal head of 35 meter coupled with tefc sq. cage induction motor make ( kriloskar / crompton / jyoti ) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with cidf sluice valve 1 no, cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tire coupling 1 no etc all complete. , supplying all labour tools and tackles for making pcc foundtiaon 1 no. of size 4x3’x3 with all materials such as cement , sand, stone chips, foundation bolt 6nos, reducer and plastering and punning over exposed surface and jointing the existing delivery and suctionpipeline etc all complete job. , providing floor / wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – ( a ) proper distribution 200 amp copper bus bar 4 pole 1 set ( b ) tpn mccb 250 amp l&t / siemens make withearth faultrelay for incoming feeder – 1no. ( c ) mccb 100 amp tp l&t / siemens make for outgoing feeder 2 nos. ( 1no for each pump sets ) ( d ) suitable size of fully automatic star delta starter l & t / bch / schnider make 2 nos. ( e ) with suitable kvr ( capacitor ) for improving power factor ( f ) 0 500 v voltmeter with selector switch 2nosct operated ampere meter ( 0 200a ) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wireetc all complete job and testing on load. , cost towards supplying andlaying of 50 mm2 x , 3 ½ core pvc insulated and pvc sheathed , 1.1 kv grade armored aluminum cable of reputed make and isi marked doing connection from pole to panel board . , cost towards supplying and laying of 10 mm2 , 3 core pvc insulated and pvc sheathed, 1.1 kv grade unarmored copper cable of reputed make and isi marked for doing connection from panel to motor.jsor m1062 , cost towards making cable mouth for ( a ) 50 mm2 16nos , ( b ) 10mm2 24nos , cost of doing internal light wiring of pump house with 7 / 18 single core copper wire will all required making short point 1 no, medium point 2nos, long point 1 no with supplying and fixing 4x40 watt tube light 1 nos, 25 watt, led flood light with bracket 1 no etc including materials and labor chargesall compelte 1 job. , earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonary with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 02 nos. for pump set and 02 nos. for transformer ( one body earthing and one neutral earthing ) , supplying and laying of 8 swg copper wire for making earthing connection in to from earthing station to panel to motor. , cost for supply and fitting of 200 amp. tpn main switch / switch disconnector and doing all line connection. , costtowards repairing and complete overhauling of 60 kva servo controlled automatic voltage stabilizer, disconnectingall electric line and joints and checking defects and removing them by s / f of damaged spare parts such as 10 kg operating motor 02 nos , carbon brush 03 nos, main transformer 01 no , control transformer 01 no and doing internalwiring in propergauge of wire and reassembling the same and test on full load , including tools tackles and labor charges. , supply and top up transformer oil of reputed make...

Drinking Water And Sanitation Department - Jharkhand

36990237 renovation of rural water supply scheme at bandh basti kathara , raw water pumping plant: , supplying all labor tools and tackles for taking out old and damaged vt pump sets from intake well with all accessories , demolition of mounting channel for installation of new vertical turbine pump sets. , supplying, installation, testing and commissioning of electrically driven vertical turbine pump sets kirloskar / wpil/ mather & plate/jyoti having discharge capacity of raw water60 m3/hragainsttotal head of25 meters, coupled with vertical hollow shaft sq. cage induction motor make (kirloskar / crompton/ jyoti) operated on 415 + 10% volts, 50hz, 1470 rpm with sole plate, discharge head, m.s. d.f. column assembly random length of 5 ft, total 40 ft. s.s. line shaft, s.s, socket, spider bearing with rubber cut less bush, cidf sluice valve 1 no,cidf nr valve 1 no, pressure gauge 1 no ets all complete. note: motor capacity should have 10% above of the pump. , supplying all labor tools and tackles for making pcc foundation 3x3x1 with all materials such as cement , sand, stone chips, foundation bolt, reducer as per sample, including fixing of sole plate for installation of new vt pump sets and jointing the existing delivery pipe line etc all complete job. , cost towards supplying andlaying of 06 mm2 x3 core pvc insulated and pvc sheathed ,1.1 kv grade unarmored copper cable of reputed make and isi marked doing connection from panel to both motor. , cost towards making cable mouth for (a) 50 mm2 16 nos , (b) 06 mm2 24nos , cost of doing internal light wiring of pump house with 7/18 single core copper wire will all required making short point 1 no, medium point 2 nos, long point 1 no with supplying and fixing 4x40 watt tube light 2 nos, 25 watt, led flood light with bracket 1 no etc all complete , earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal/ coke and salt as required for chemical earthing. 02 nos. for pump set and 02 nos. for transformer (one body earthing and one neutral earthing ) , cost for supply and fitting of 200 amp. tpn main switch/ switch disconnectorand doing all line connection. , supplying and laying of 8 swg copper wire for making earthing connection in to from earthing station to panel to motor . , cost towards supplying andlaying of 50 mm2 , 3 ½ core pvc insulated and pvc sheathed ,1.1 kv grade armeredaluminum cable of reputed make and isi marked doing connection from main switch to stabilizer andstabilizer to panel . , providing floor/wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – (a) proper distribution 200 amp copper bus bar 4 pole 1 set (b) tpn mccb 100 amp l&t/ siemens make withearth faultrelay for incoming feeder – 1no. (c) mccb 100 amp tp l&t /siemens make for outgoing feeder 2 nos.(1no for each pump sets) (d) suitable size of fully automatic star delta starter l & t/ bch/schnider make 2 nos., (e) with suitable kvr (capacitor) for improving power factor (f) 0 500 v voltmeter with selector switch 2nosct operated ampere meter (0 200a) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wireetc all complete job and testing on load. , providing, erecting 30 kva servo controlled automatic voltage stabilizer suitable for output voltage 415v+/ 1% and input 280 450 v, 3 phase ,50 hz , with copper wound transformer (oil cooled ) as mentioned below. the stabilizer shall function satisfactorily even if incoming supply is unbalanced between the phases within range of 10%. the stabilizer should be constructed in cubical box ,with by bidirectional wheels for easy handlingnecessarymonitors and users controls on front panel such as indication , alarm ,voltmeterand selector switch formeasuring input and output voltage , auto/manual selector switch , raise/low push buttons etc.suitable capacity termination strips and bush bars for incoming & outgoing cable should be provided. all three phases shall be independently monitored and corrected. following protections and indications shall be incorporated as per is :9815 (a) over voltage /under voltage (b) single phasing (c) cut off contractor with electronicoutput sensing unite suitable change over switch and earthing. , supply and top up transformer oil of reputed make , clear water pumping plant: , supplying all labour tools and tackles for taking out old and damaged c/f pump set with all accessories , demolition of foundationfor installation of new hsc centrifugal pump sets. , supplying, installation, testing and commissioning of electrically drivenhorizontal split casing centrifugalpump set make(kirloskar/ wpil/ mather& plate/jyoti ) having discharge capacity of clear water50 m3/hragainsttotal head of 45 meter coupled with tefc sq. cage induction motor make (kriloskar/ crompton /jyoti) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with cidf sluice valve 1 no,cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tire coupling 1 no etc all complete. , supplying all labour tools and tackles for making pcc foundtiaon 1nos, of size 4x3’x3 with all materials such as cement , sand, stone chips, foundation bolt 6nos,reducer and plastering and punning over exposed surface and jointing the existing delivery and suctionpipeline etc all complete job. , providing floor/wall mounted cubical l.t power control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – (a) proper distribution 200 amp copper bus bar 4 pole 1 set (b)tpn mccb 200 amp l&t/ siemens make withearth faultrelay for incoming feeder – 1no. (c) mccb 100 amp tp l&t /siemens make for outgoing feeder 2 nos.(1no for each pump sets) (d) suitable size of fully automatic star delta starter l & t/ bch/schnider make 2 nos. (e) with suitable kvr (capacitor) for improving power factor (f) 0 500 v voltmeter with selector switch 2nosct operated ampere meter (0 200a) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wireetc all complete job and testing on load. , cost towards supplying andlaying of 70 mm2 x , 3 ½ core pvc insulated and pvc sheathed ,1.1 kv grade armored aluminum cable of reputed make and isi marked doing connection from main switch to stabilizer and stabilizer to panel board . , cost towards supplying and laying of 10 mm2 , 3 core pvc insulated and pvc sheathed,1.1 kv grade unarmored copper cable of reputed make and isi marked for doing connection from panel to motor. , cost towards making cable mouth for (a) 70 mm2 16nos , (b) 10mm2 24 nos , cost of doing internal light wiring of pump house with 7/18 single core copper wire will all required making short point 1 no, medium point 2nos, long point 1 no with supplying and fixing 4x40 watt tube light 1 nos, 25 watt, led flood light with bracket 1 no etc including materials and labor chargesall compelte 1 job. , earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonary with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal/ coke and salt as required for chemical earthing. 02 nos. for pump set and 02 nos. for transformer (one body earthing and one neutral earthing ) , supplying and laying of 8 swg copper wire for making earthing connection in to from earthing station to panel to motor. , cost for supply and fitting of 200 amp. tpn main switch/ switch disconnector and doing all line connection. , providing, erecting 50 kva servo controlled automatic voltage stabilizer suitable for output voltage 415v+/ 1% and input 280 450 v, 3 phase ,50 hz , with copper wound transformer (oil cooled ) as mentioned below. the stabilizer shall function satisfactorily even if incoming supply is unbalanced between the phases within range of 10%. the stabilizer should be constructed in cubical box ,with by bidirectional wheels for easy handlingnecessarymonitors and users controls on front panel such as indication , alarm ,voltmeterand selector switch formeasuring input and output voltage , auto/manual selector switch , raise/low push buttons etc.suitable capacity termination strips and bush bars for incoming & outgoing cable should be provided. all three phases shall be independently monitored and corrected. following protections and indications shall be incorporated as per is :9815 (a) over voltage /under voltage (b) single phasing (c) cut off contractor with electronicoutput sensing unite suitable change over switch and earthing. , supply and top up transformer oil of reputed make...

Central Coalfields Limited - Jharkhand

36725953 repairing of vertical turbine pump of discharge 330 cum/hr, 415 v, 5 stage, make worthington and model c14tc with serial no. 3al/6146/48 installed at intake cpp pump house under kathara colliery....

Bharat Coking Coal Limited - Jharkhand

36632059 complete repairing of 2000gpm, 3stage, 180mtr.head flowmore make turbine pump sl. no. 14122017/80/02 of socp patch, muraidih, amp colliery. complete repairing of 2000gpm, 3stage, 180mtr.head flowmore make turbine pump sl. no. 14122017/80/02 of socp patch, muraidih, amp colliery....

Drinking Water And Sanitation Department - Jharkhand

34796501 tender for rate for supply installation and commissioning of pump set and its accessories at chatra , hazaribag , ramgarh, jhumerteliya / koderma urban water supply scheme pumping plant 1 cost towards supply, installation and commissioning ofhorizontal split case centrifugal pump set of make mather and platt / kirlosker / wpil / jyotiwithbronze / ss impeller , coupled with suitable tefc squirrel cage induction motor make kirloskar / jyoti / crompton / abbmakeand mounted on a common ms base plate, operated on 415 volt ± 10%, 3 phase 50 hz. a.c supply having suitable 1480 rpm, along with suitable nr valve 1 no , sluice valve 2 no., foot valve 1 no., pressure gauge etc. all complete.1.1 capable of discharging50000 gphat a head of 42mtrs 2 1.2 capable of discharging27200 gphat a head of 50mtrs 3 1.3 capable of discharging21500 gphat a head of 50 mtrs 4 1.4 capable of discharging14300 gphat a head of 40mtrs 5 cost towards supplying, installation, testing and commissioningof water lubricatedvertical turbine pump sets make mather & plate / kirloskar / jyoti / wpil with heavy duty m.s column assemblycoupled with vertical hollow shaft sq. cage induction motor make kirloskar / jyoti / crompton / abboperated on 415±10% volts, 50 hz 1480 rpm with sole plate, discharge head, s.s. socket, spider bearing, sluice valve 1 no. nr valve – 1 no., pressure gauge – 1 no. etc all complete.2.1 capable of discharging 28000 gph at a head of 34mtrs...

Bharat Coking Coal Limited - Jharkhand

34524832 complete repairing and overhauling of pl iii 1000 gpm 200 mtr head 5 stage m and p make turbine pump 1 no. for pumping having sl no. bccl/jg/pump/1000 gpm/03 of amal. nt st jg ocp under lodna area....

Bharat Coking Coal Limited - Jharkhand

34519597 lowering of three 4000gpm pump motor set of jharna face sump and extension of 3rd range of jharna face from purba face to khodo river and replacing of bd 2000gpm pump motor set of muraidih river side with a turbine pump and other maintenance of domestic pipe line near mocp filter plant and maintenance of three ht pump of jharna face and two ht pump of 3rd patch sump of muraidih amp colliery...

Drinking Water And Sanitation Department - Jharkhand

34405116 supplying installation and commissioning of 50 kva servo controlled automatic voltage stabilizer and repair maintenance of 15 hp vt p set , cost towards supplying, installation testing & commissioning of electrically driven vertical turbine pump set ( kirloskar / wpil / mather & platt / jyoti ) operated on 415 ± 10% volt, 50 hz. 1470 rpm with sq. cage induction motor suitable for vt pump having discharge capacity of 29 m3 / hr. against the total head of 100 mtrs, discharge head, m.s.d.f. column assembly random length of 5 feet, total 25feet s.s. line shaft, s.s. socket, spider bearing with rubber cutless bush, c.i.d.f. sluice valve – 1 no, c.i.d.f. nr valve – 1 no etc all including fasd starter ( l&t / siemens make ) compatible with above motor pump set. , cost towards repairing and overhauling of 15 h.p. v.t. pump set 6 – stage ball assembly s / f impeller g.m. bush as per sample 5 – nos each, s / f housing bush as per sample. replace in spider rubber cutlass bush – 2 nos, replacing of 25mm dia. 5 feet long s.s. line shaft – 4 nos with s.s. socket . transportation charge from site to work shop vice versa including tools – tackles and labour charges for lifting & lowering v.t. pump before and after repairing work etc all complete at pumping plant. , cost towards supply installation and fixing of fasd starter ( l&t make / havell’s or any reputed company ) compatible for 15 h.p. 3 phase induction motor, , cost towards repairing and maintaining of lighting arrangements inside and outside of pump house by installing 75 w led street lights – 1 no., 27 w led lights – 1 no., s / f of on off switch, indicator, 3 pin socket, wooden / fiber board, electric cables etc. all complete. , cost towards supply and installation of kit kat fuse of 100amp and 415± 10% volt having material of porcelain 3pc in 1set with box . , cost towards supplying and installing isi mark c.i d / f non return valve of 100mm dia. ( sl no. 10, jsor m 1039 ) , cost towards supplying, installation & commissioning 50 kva servo controlled automatic voltage stabilizer, suitable for out put of 415 volt ± 1%, 3 phase, 50 hz with copper wounded transformer oil cooled. the stabilizer shall function satisfactorily even if coming supply is unbalanced between phases within range of 10%. the stabilizer should be constructed in cubical box with bidirectional wheels for easy handling, necessary monitors and users control on front panel such as indication, alarm, volt meter & selector switch for measuring input and output voltage, auto / manual selector switch, raise / low push button etc. suitable capacity termination strips & bus bar for incoming and outgoing cable should be provided. all 3 phases shall be independently monitored & corrected . following protections and indications shall be incorporated over voltage / under voltage single phasing cut off contactor with electronic output sensing unit. ( sl no. 150, jsor m 1066 ) ...

Drinking Water And Sanitation Department - Jharkhand

34390715 tender for detailed survey designing and drawing construction of water treatment plant with clear water rising main and network house connection intake well installation od vertical turbine pump motor operation and maintenance work...

Bharat Coking Coal Limited - Jharkhand

33426422 repairing and rewinding of electric motors for complete reapiring/overhauling of pl iii 5 stage mnp make ht turbine pump of nichitpur colliery under sijua area....

Central Coalfields Limited - Jharkhand

33366614 repairing and thorough overhauling of vertical turbine pump of discharge 330 m3 / hr, 415 v, 5 stage, make worthington and model c14tc with serial no. 1al / 6146 / 48 installed at intake cpp pump house under kathara colliery. ...

Central Coalfields Limited - Jharkhand

33366460 repairing and reconditioning of 02nos, 550 volt, 200amps acb, for 5a seam turbine pump at 3 level and 18 level andrew yule make mine no 01 of kedla u / g project. r ...

Drinking Water And Sanitation Department - Jharkhand

33165334 tender are invited for hsc pump sets and vertical turbine pump set of multi village rural pipe water supply scheme and amrapara rural water supply scheme material supply, installation and commissioning of pump setpertaining to drinking water supply from reputed manufacturers/authorsed dealers for respective items for civil construction/infrastructure works and repair works....

Drinking Water And Sanitation Department - Jharkhand

32639583 government of jharkhand through its public works department ( pwd ) is engaged in framing / revision of schedule of rates and as part of this endeavor, quotations through e tender are invited for replacement of damaged electro mechanical items of ( a ) babhangama rural ( mvs ) water supply scheme, ( b ) sarath rural ( mvs ) water supply scheme and ( c ) kairow rural ( mvs ) water supply scheme ( material supply, installation and commissioning of pump set works pertaining to drinking water supply a babhangama rural ( mvs ) water supply scheme 1 pump & motor : 1.01 supplying, installation, testing and commissioning of electrically driven vertical turbine pump sets kirloskar / wpil / mather & plate / jyoti having discharge capacity of raw water 50 m3 / h against total head of 40 meter, in all concern coupled with vertical hollow shaft sq. cage induction motor make ( kirloskar / crompton / jyoti ) operated on 415 ± 10% volt, 50hz, 1460 rpm ( 10% above the capacity of pump ) with sole plate, discharge head, m.s. d.f. column assembly random length of 5ft, total 50ft s.s. line shaft, s.s. socket, spider bearing with rubber less bush, cidf sluice valve 1no, cidf nr valve 1no, pressure gauge 1no & fixing the discharge new pump to the existing common header etc. complete. motor control panel 100 amp. 2.01 cost towards replacement of old panel by supply, installation & commissioning of new floor mounted motor control panel comprising 100 amp copper bus bar 04 nos. in m.s. steel ( 16swg ) cubical box ( 3’ x 2.5’ x 1’ )  t.p.n. main switch sdf type in ss enclosure make l&t 100 amp 1 no.  three pole mccb ( make l&t ) 63 amp 1 no. for incomer feeder.  three pole mccb ( make l&t ) 32 amp 2 nos. for starter.  fasd starter ( make l&t ) suitable for 15 hp pump set. 02 nos.  ammeter 03 nos. ( 0 50amp ) 01 no., ( 0 30amp ) 02 nos.  voltmeter ( 0 500v ) 1 no. mcp should be comprising with selector switches, phase indicator ( ryb ) , push button ( start & off ) , on off indicator for starter, provision of lighting arrangement ( 25amp mcb ) etc. all complete. for clear water p / plant 2.02 cost towards replacement of old panel by supply, installation & commissioning of new floor mounted motor control panel comprising 100 amp copper bus bar 04 nos. in m.s. steel ( 16swg ) cubical box ( 3’ x 2.5’ x 1’ )  t.p.n. main switch sdf type in ss enclosure make l&t 100 amp 1 no.  three pole mccb ( make l&t ) 100 amp 1 no. for incomer feeder.  three pole mccb ( make l&t ) 63 amp 2 nos. for starter.  fasd starter ( make l&t ) suitable for 15 hp pump set. 02 nos.  ammeter 03 nos. ( 0 50amp ) 01 no., ( 0 30amp ) 02 nos.  voltmeter ( 0 500v ) 1 no. mcp should be comprising with selector switches, phase indicator ( ryb ) , push button ( start & off ) , on off indicator for starter, provision of lighting arrangement ( 25amp mcb ) etc. all complete. for raw water p / plant for raw water p / plant b sarath rural ( mvs ) water supply scheme 1 pump & motor : 1.01 supplying, installation, testing and commissioning of electrically driven horizontal split casing centrifugal pump set make ( kirloskar / wpil / mather & platt / jyoti ) having discharge capacity of clear water 35 m3 / h against total head of 40 meter coupled with tefc sq. cage induction motor make ( kirloskar / crompton / jyoti ) operated on 415 + 10% volts, 50hz, 1440 rpm mounted on common m.s. fabricated base plate with cidf sluice valve 1 no, cidf nr valve 1 no, pressure gauge 1 no, tire coupling 1 no, etc. all complete. 2 motor control panel 100 amp. 2.01 cost towards supplying, fitting & commissioning of motor control panel for operating 2 nos. pump set with fasd starter to operate installed c / f pump set having 63 amp mccb as main incomer, 40 amp mccb as main switch of starters, led indicator, amp meter ( 0 30 amp ) for each pump & volt meter ( 0 500 volt ) selector switch motor control panel should have copper bus bar arrangement. the panel box should be made of swg 18 iron sheet, size 2’ x 1½’ x 1’ with 3 layer pvc paint. all electrical elements should be fitted in iron box. control panel box should be of wall hanging type. kairow rural ( mvs ) water supply scheme pump & motor : supplying, installation, testing and commissioning of electrically driven vertical turbine pump sets kirloskar / wpil / mather & plate / jyoti having discharge capacity of raw water 60 m3 / h against a total head of 45 meter, in all concern coupled with vertical hollow shaft sq. cage induction motor make ( kirloskar / crompton / jyoti ) , operated on 415 ± 10% volt, 50hz, 1460 rpm ( 10% above the capacity of pump ) with sole plate, discharge head, m.s. d.f. column assembly random length of 5ft, total 50ft s.s. line shaft, s.s. socket, spider bearing with rubber cut less bush, cidf sluice valve 1no, cidf nr valve 1no, pressure gauge 1no etc. all complete....

Central Coalfields Limited - Jharkhand

32605829 a). repairing & overhauling of vertical turbine pump set, 1000 gpm, 07 stage, 140 mtr head installed at iwss / ccd unit of dhori area, m/c sl.no 1530791012 b). dismantling of motor, couplings, base frame, delivery pipe line connection, 07 stages vt pump along with line shaft, shafting tube, column pipes, all other attachment & reassembling of complete pump with re commissioning of vertical turbine pump set, 1000 gpm, 07stage, 140 mtr head,...

Drinking Water And Sanitation Department - Jharkhand

32583653 complete renovation work with supply installation testing and commissioning of pump sets, motor control panels, cables and its allied works at raw water and clear water pumping plant at multi village rural water supply scheme, pandra 1.a raw water pumping plant: 1.01 cost towards supplying, installation, testing and commissioning of electrically driven horizontal split casing centrifugal pump set make ( kirloskar / wpil / mather & plate / jyoti ) coupled with tefc sq. cage induction motor make ( kirloskar / crompton / jyoti / abb ) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with 4dia or suitable size of cidf sluice valve 1 no, cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tyre coupling 1 no etc all complete. head 18 m discharge 120 m3 / h ( hp 15 approx ) 1.02 supplying all labour tools and tackles for taking out old and damaged c / f pump set with all accessories , demolition of foundation for installation of new hsc centrifugal pump sets. 1.03 supplying all labour tools and tackles for making new pcc foundation of size 4′ x 2.5 x 2.5′ with all materials such as cement , sand, stone chips, foundation bolt 6 nos etc all complete and plastering and punning over exposed surface with all labour tools, tackles and technician charges. 1.04 cost for supply and laying of suction pipe line with supplying of 5 dia or suitable dia size as per pump at site, heavy duty g.i. pipe 6 m, bend 2 nos., flange 6 nos., nut, bolt, washer 10kg, rubber insertion 5kg etc, cutting of pipe in required size and doing complete welding work including all labour, tools, tackle and technician charges. with cp & ohc. ( rate after deducting the scrap materials. ) 1.05 cost for supply and laying of 4dia delivery pipe line with supplying of 4 dia or suitable dia size as per pump at site, heavy duty g.i. pipe 6m, bend 1 nos., flange 4 nos., nut, bolt, washer 5kg, rubber insertion 5kg etc, cutting of pipe in required size and doing complete welding work including all labour, tools, tackle and technician charges. with cp & ohc. ( rate after deducting the scrap materials. ) 1.06 cost for supplying and laying of 3 core x 10 mm2, pvc insulated and pvc sheathed unarmoured copper cable of 1.1 kv grade. from panel to motor in 2 length each for both motor. with cp and ohc. 1.07 socketing of terminal ends with s / f of terminal socket including all labour , tools and tackles. 3 core x 10 mm2copper cable. 1.08 cost for supplying and laying of 3.5 core x 25 mm2, pvc insulated and pvc sheathed armoured aluminum cable of 1.1 kv grade. from electric pole to panel with cp and ohc. 1.09 socketing of terminal ends with s / f of terminal socket including all labour , tools and tackles. 3.5 core x 25 mm2aluminium cable. 1.10 cost towards supplying, installation, testing and commissioning of tpn main switch / isolator of 100a , make ( havells / schnieder / l&t / any reputed make isi marked. ) . 1.11 providing floor / wall mounted cubical l.t motor control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – proper distribution 100 amp copper bus bar 4 pole 1 set micro processor base tpn mccb 100 amp l&t / siemens make with earth fault relay for incoming feeder – 1no. mccb 63 amp tpn type l&t / siemens make for outgoing feeder 3 nos. ( 1no for each pump sets+1 no. as spare ) suitable size of fully automatic star delta starter make l&t / bch / schnider make 3nos. 0 500 v voltmeter with selector switch 3nos ct operated ampere meter ( 0 200a ) with ct 3 sets with selector switch 3 nos, phase indicating neon lamp 9 nos., s.p.p. 3 nos. doing internal wiring with proper gauge of copper wire etc all complete job and testing on load. 1.12 cost for doing chemical earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 1.13 supplying and laying of 8 swg copper wire / gi wire for making earthing connection in to from earthing station to panel to motor . 1.14 cost towards doing complete electric wiring inside and outside of pump house with s / f of copper cable, switches, bulb holder, sockets, indicator lamp, led bulb 2, led tube light 1no., 40w led flood light 1no. etc all complete including transportation and electrician charges. 1.b clear water pumping plant: 1.01 cost towards supplying, installation, testing and commissioning of electrically driven horizontal split casing centrifugal pump set make ( kirloskar / wpil / mather & plate / jyoti ) coupled with tefc sq. cage induction motor make ( kirloskar / crompton / jyoti / abb ) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with suitable size of cidf sluice valve 1 no, cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tyre coupling 1 no etc all complete. head 50 m discharge 54 m3 / h ( hp 20 approx ) 1.02 supplying all labour tools and tackles for taking out old and damaged c / f pump set with all accessories , demolition of foundation for installation of new hsc centrifugal pump sets. 1.03 supplying all labour tools and tackles for making new pcc foundtiaon 2nos, of size 5′x3x3′ with all materials such as cement , sand, stone chips, foundation bolt 6nos etc all complete and plastering and punning over exposed surface. 1.04 cost for supply and laying of suction pipe line with supplying of 4 dia or suitable dia size as per pump at site heavy duty g.i. pipe 6m, bend 2 nos., flange 6 nos., nut, bolt, washer 10kg, rubber insertion 5kg etc, cutting of pipe in required size and doing complete welding work including all labour, tools, tackle and technician charges.with cp & ohc. ( rate after deducting the scrap materials. ) 1.05 cost for supply and laying of 3dia delivery pipe line with supplying of 3 dia or suitable dia size as per pump at site heavy duty g.i. pipe 6m, bend 1 nos., flange 4 nos., nut, bolt, washer 5kg, rubber insertion 5kg etc, cutting of pipe in required size and doing complete welding work including all labour, tools, tackle and technician charges. with cp & ohc. ( rate after deducting the scrap materials. ) for pump house no 1 & 2. 1.06 cost for supplying and laying of 3 core x 10 mm2, pvc insulated and pvc sheathed unarmoured copper cable of 1.1 kv grade. from panel to motor in 2 length each for both motor for both pump house with cp and ohc. 1.07 socketing of terminal ends with s / f of terminal socket including all labour tools and tackles. 3 core x 6 mm2, copper cable 24 ends. 1.08 providing floor / wall mounted cubical l.t motor control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – proper distribution 100 amp copper bus bar 4 pole 1 set micro processor base tpn mccb 100 amp l&t / siemens make with earth fault relay for incoming feeder – 1no. mccb 63 amp tpn type l&t / siemens make for outgoing feeder 2 nos. ( 1no for each pump sets ) suitable size of fully automatic star delta starter make l&t / bch / schnider make 2 nos. 0 500 v voltmeter with selector switch 2nos ct operated ampere meter ( 0 200a ) with ct 2 sets with selector switch 2nos, phase indicating neon lamp 6nos, s.p.p. 2nos doing internal wiring with proper gauge of copper wire etc all complete job and testing on load. 1.09 cost towards supplying, installation, testing and commissioning of tpn main switch / isolator of 100a , make ( havells / schnieder / l&t / any reputed make isi marked. ) . each for pump house no 1 &2. 1.10 cost for supplying and laying of 3.5 core x 50 mm2, pvc insulated and pvc sheathed armoured aluminum cable of 1.1 kv grade. from electric pole to panel with cp and ohc. for pump house no 1 &2. 1.11 socketing of terminal ends with s / f of terminal socket including all labour , tools and tackles. 3.5 core x 50 mm2aluminium cable. 1.12 cost for doing chemical earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 1.13 supplying and laying of 8 swg copper wire for making earthing connection in two from earthing station to panel to motor . 1.14 cost of doing internal electric wiring with s / f of 3 / 20 single core copper cable with s / f of on off switches, indicator, fuses, sockets, switch board, junction boxes, pvc casing, nails & allied fittings etc including supplying and fixing 40 watt led tube light 2 nos, 12w led bulb 2 nos with all fittings etc including electrician charges for raw water pumping plant, clear water pumping plant pump house no 1&2 and outside of pump house etc all complete. 1.15 cost supplying and fixing of 40 watt led flood light with bracket with all fittings and accessories etc all complete for clear water premises. with c.p. & ohc. [ make havells / syska / mescab / bajaj / any reputed make. ] 2 supplying, installation, testing and commissioning of 2 set of new 175 hp vt pump sets and its allied work at raw water pumping plant , multi panchayat rural water supply scheme madhuban pirtand 2.01 supplying, installation, testing and commissioning of water lubricated vertical turbine pump [ make: kirloskar / mather & platt / jyoti / wpil ] capable of discharging 45 lps raw water against a total head of 185 meter at speed not more than 1500 rpm as per is: 1710 / 1989 with column length not less than 50 ft in 5ft each with closed type ss impeller, ss line shaft, ss shaft sleeves, flanged type ms column pipes suitable for below the floor installation and existing delivery header coupled with vertical hollow shaft operated on 415v±10%, 3 phase, ac, 50±5%hz, 4 pole, duty s1, insulation f, lt squirrel cage induction motor with suitable size of coupling as per latest is specification [ make: abb / bhel / crompton / marathon / jyoti / kirloskar ] having 10% more bhp than the pump, making alignment, making electrical connections, with all required tools, tackles, consumables as required, testing and commissioning on full load as per the direction of e / i. etc all complete. 2.02 cost towards dismantling, lifting of old 175 hp pump sets with all 200 mm dia column pipes from intake well and lowering new pump sets with all accessories along with all labour tools and tackles etc all complete. 2.03 cost towards breaking of old pcc foundation and removing of all garbage from pump house to outside with lead of 300 m with all labour tools and tackles etc all complete. 2.04 cost towards making of new pcc foundation sizing 3 x 3 x 1 with supplying and fitting of foundation bolt 4nos., cement, sand , stone chips, as required and plastering and punning over exposed surface etc with materials, all labour tools and tackles etc all complete. 2.05 cost towards supply and laying of 3c x 95 sq. mm copper cable, pvc insulated & pvc sheathed, 1100v grade, isi marked, make.havells / polycab / finolex / gemscab / any reputed make for 3 pump sets. 2.06 socketing of terminal ends with s / f of terminal socket including all labour , tools and tackles. 3 core x 95mm2, copper cable 12 ends. 2.07 providing floor mounted cubical l.t motor control panel fabricated with ms sheet and painted, dust and vermin proof, proper ventilated, consisting of – ( a ) incoming: ( i ) proper distribution 800 amp copper bus bar 4 pole 1 set ( ii ) mccb 800 amp. acb, make l&t / siemens for incoming feeder 1no. ( iii ) 0 500 v voltmeter 1no. with selector switch 1 no, ct operated ampere meter ( 0 500a ) 1no. selector switch 1 no, phase indicating neon lamp 3 nos. b ) outgoing: i ) mccb 630 amp. tpn type, make l&t / siemens for outgoing feeder 3 nos. ( 01 no for each pump set ) ii ) suitable size of fasd starter l&t / bch / schneider make 3 nos. iii ) 0 500 v voltmeter 3nos. with selector switch 3 nos, ct operated ampere meter ( 0 500a ) 3nos. selector switch 3 nos, phase indicating neon lamp 9 nos, single phase preventor 3 nos., doing internal wiring with proper gauge of copper wire etc all complete job with testing on full load. 2.08 cost towards supplying and fixing 5 ton capacity, triple spur gear type chain pulley block suitable for capacity as below with 6 meter lift complete with load chain and hand chain suitable for above lift , tested to 50% over load as per is 3832 carrying isi mark with travelling trolley etc. 3 repairing and overhauling of motor control panels, pump sets and its allied works at clear water pumping plant at maithan ( 14.5mld wtp ) of dhanbad urban water supply scheme phase ii 3.01 cost towards repairing and complete overhauling of motor control panel with all labour tool, tackles and technician charges for disconnecting the electric line & opening of electric wire connection inside panel. cleaning, checking, rectifying of faults with supply and fitting of contacter set ( 3tf56 1no and 3tf53 2no. ) seimens make or equivalent capacity of isi marked reputed make, over load relay 1no., transformer oil 30 liter, changing of ampere meter, voltmeter, indicating lamps etc all complete work, dressing and doing fresh electric connection with new wire and connector inside panel, rechecking of all connections and testing on full load. ( rate after deducting the cost of scrap materials ) . 3.02 cost towards repairing and overhauling of 150hp centrifugal pump and changing of its damaged parts such as pump shaft of en9 materials 1no., ss gland bush 2nos., neckring bush 2nos., checknut 2nos., bearing housing of c.i. materials 2nos. as per sample, supply and fitting of ball bearing skf make 6311 2nos. etc with all labour, tools and tackles, transporting etc all complete. ( rate after deducting the cost of scrap materials ) . 3.03 cost towards overhauling and repairing of 150hp, 3phase induction motor operated on 415v, 50hz, with dismantling of motor, heating, varnishing, supplying and fitting of lead bit having 4 nos hole including supply and fitting of brass nut bolt of 24mm in length with suitable dia for both ends terminal ( motor joint box end & mcp end ) for 150hp motor, supply and fitting of skf make 6319 ball bearing 2nos. etc all complete assembly of the motor and testing on load with all labour, tools and tackles, transporting etc all complete. ( rate after deducting the cost of scrap materials ) . 3.04 cost towards supply and laying of 3 c x 120 sq. mm copper, xlpe unarmoured cable, 1100v grade, from starter panel to motor for 4nos. motor. [ make polycab / finolex / havells / kei / gemscab / any reputed make ] with c.p and ohc etc. [ jsor dwsd 2021 146 m1062 6 ] 3.05 cost towards making cable mouth for above cable with s / f of lugs, pvc tape etc including all labour, tools, tackle and technician charges etc all complete 3.06 earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonary with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal / coke and salt as required for chemical earthing. 3.07 supplying and laying of 8 swg copper wire for making earthing connection in to from earthing station to panel to motor . 3.08 cost towards supplying, installation, testing and commissioning of 40 watt semi integrated solar street light luminary including battery inside, g.i. pole 6mtrs, structure, arms , nut & bolts etc, suitable spv modules, 2.5 sq. mm x 2 core wire for connection with all labours, tools and tackles etc all complete. [ make havells / exide / any isi marked reputed make ] with cp & ohc. 3.09 cost towards supplying and laying of 2c x 2.5 sq. mm, pvc insulated and pvc round sheathed, copper conductor ( flexible ) industrial cable, 1100 volt, isi marked for common line for all 20nos. flood light as above. [ make havells / polycab / finolex / rr ] with cp & ohc. 4 renovation with supply installation testing and commissioning of pump set, overhauling of motor control panel and its allied work at rural water supply scheme, chirkunda kumardhubi, maithan ( old scheme ) 4. ( a ) raw water pumping plant : 4.01 cost towards supplying, installation, testing and commissioning of electrically driven horizontal split casing centrifugal pump set make ( kirloskar / wpil / mather & plate / jyoti ) coupled with tefc sq. cage induction motor make ( kirloskar / crompton / jyoti / abb ) operated on 415 + 10% volts, 50hz, 1470 rpm mounted on common m.s. fabricated base plate with suitable size of cidf sluice valve 1 no, cidf nr valve 1 no, foot valve 1 no, pressure gauge 1 no, tyre coupling 1 no etc all complete. head 50 m discharge 275 m3 / h ( hp 100 approx ) 4.02 supplying all labour tools and tackles for taking out old and damaged c / f pump set with all accessories , demolition of foundation for installation of new hsc centrifugal pump sets. 4.03 supplying all labour tools and tackles for making new pcc foundtiaon of size 6′ x 3 x 3′ with all materials such as cement , sand, stone chips, foundation bolt 6nos etc all complete and plastering and punning over exposed surface with all labour, tools, tackle and technician charges. 4.04 cost towards supply and laying of suction pipe line with s / f of 10 dia g.i. pipe 2 meter, 10 dia g.i. bend 1 no., 10dia g.i. flange 4nos., rubber insertion 10kg, nut, bolt & washer 10kg etc and cutting of pipe in required size and doing complete welding work including all labour, tools, tackle and technician charges.with cp & ohc. ( rate after deducting the scrap materials. ) 4.05 cost towards supply and laying of 8dia delivery line with s / f of 8 dia heavy duty g.i. pipe 1 meter, 8dia g.i. flange 4nos., rubber insertion 10kg, nut, bolt & washer 10kg etc and cutting of pipe in required size and doing complete welding work including all labour, tools, tackle and technician charges.with cp & ohc. ( rate after deducting the scrap materials. ) 4.06 cost towards overhauling of motor control panel with all labour tool, tackles and technician charges for disconnecting the electric line & opening of electric wire connection inside panel. cleaning, checking, rectifying of faults with supply and fitting of damaged spares such as bus bar 1set, ampere meter 1no., voltmeter 1no., indicating lamps 3 no. etc, dressing of motor cables with new lugs, crimping works etc all complete and testing on full load. ( rate after deducting the cost of scrap materials ) . 4.07 cost towards overhauling of f.a.s.d. starter panel with all labour tool, tackles and technician charges for disconnecting the electric line & opening of electric wire connection inside panel. cleaning, checking, rectifying of faults with supply and fitting of contacter set ( ml 4 1no and ml 6 1no. ) l&t make or equivalent capacity of isi marked reputed make, over load relay 1no., timer 1no., spp 1no. etc all complete work, dressing and doing fresh electric connection with new wire and connector inside panel, rechecking of all connections and testing on full load. ( rate after deducting the cost of scrap materials ) . 4.08 cost towards supplying and fitting of 40w led flood light, with bracket, copper wire, on off switch etc with all accessories including all labour tools , tackles and technician charges., with cp & ohc, ( rate after deducting the scrap materials. ) . make havells / syska / mescab / polycab / phillips 4.09 providing chipping work on the roof surface of raw water pump house, removing of all garbage to outside with lead of 50 m , providing and cleaning of concrete surface to remove dust and cement laitance by cleaning with compressed air & water jet including all materials, labour, tools complete. pounding test to be done after plugging all outlets and to be checked from soffit to identify seepage, leakage. on identification of seepage, cement grouting to be done with non shrink expanding admixture of sika lndia pvt.ltd. / myk schomberg / dr fixit / fosroc or equivalent. [ size 12.5 m x 6.7 m = 83.75 m2 ] 4.10 cost towards providing pcc m 200 in nominal mix of 1:1.5:3 on roof with approved quality of stone chips 12mm to 6mm size graded and clean course sand of fm 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete as per building specification and direction of e / i. [ size 12.5 m x 6.7 m x 0.05 m= 4.19 m3 ] 4.11 providing 12 mm thick water proof cement plaster ( 1:3 ) with clean coarse sand of f m. 1.5 with integral water proofing compound liquid @125 ml per bag cement including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of e / i. brand fosroc conplast x421 lc, sika plastocrate plus, dr fixit pidiproof lw+, myk proof wp 10 or equivalent. [ size 12.5 m x 6.7 m = 83.75 m2 ] 4.12 dismantling old plaster and pointing in cement or lime and taking out joints to 15mm. depth, watering and disposal of unserviceable materials with all leads all complete as per direction of e / i. inside and outside of pump house, approx=280m2 4.13 providing 6mm thick cement plaster ( 1:4 ) in ceiling and wall of building with clean coarse sand of f.m. 15 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of e / i. 4.14 providing two coats of snowcem of approved shade and make over old surface including washing cleaning and preparing the walls , scaffolding, curing and taxes all complete as per building specification and direction of e / i. 4.15 providing 2 ( two ) coats of synthetic enamel paint of approved shade & make over steel surface including cleaning the surface, removing dirt, scales, smokes, grease, scaffolding & taxes all complete as per building specification and direction of e / i. for door, window, common header pipe, valves etc. approx 20m2 ( b ) clear water pumping plant : 4.01 cost towards supplying and fitting of complete rotating assembly for 50hp centrifugal pump, having head 65m discharge 113.5 m3 / hr make kirloskar with ss pump shaft, c.i. impeller, ss sleeve, bushes, gland tightener 2nos., ball bearing etc all complete with machining as per size and sample, assembling and fitting on the base plate, with all labour tools tackles and technician charges. ( rate after deducting the scrap materials. ) 4.02 cost towards supplying and fitting of complete rotating assembly for 50hp centrifugal pump, having head 70 m discharge 114 m3 / hr make wpil with ss pump shaft, c.i. impeller, ss sleeve, bushes, gland tightener 2nos., ball bearing etc all complete with machining as per size and sample, assembling and fitting on the base plate, with all labour tools tackles and technician charges. ( rate after deducting the scrap materials. ) 4.03 cost towards supplying and fitting of complete rotating assembly for 60hp centrifugal pump, having head 70 m discharge 160 m3 / hr make mather & platt with ss pump shaft, c.i. impeller, ss sleeve, bushes, gland tightener 2nos., ball bearing etc all complete with machining as per size and sample, assembling and fitting on the base plate, with all labour tools tackles and technician charges. ( rate after deducting the scrap materials. ) 4.04 cost towards supply and fitting of 4dia coupling set for 50hp pump set with nut bolt etc all complete. 4.05 cost towards supply and fitting of 4dia coupling set for 60hp pump set with nut bolt etc all complete. 4.06 supplying, fitting, installation, erecting and commissioning of approved make h.t. outdoor type gang operated air break triple pole switch, suitable for 11kv line, rotating type, with 3 post / pin type insulator per phase , mounted in horizontal or vertical position on provided cross arm with adequate length of g.i. pipe for operating handle erected on extended square shaft. the operating handle provided with lock and key at suitable height from ground with necessary clamps including cp, ohc , transportation, labour charges etc. ( rate after deducting the scrap materials. ) 4.07 cost towards supplying and fitting of 250a mccb, 3phase, 50hz, isi marked, with all labour tools , tackles and technician charges. with cp & ohc, ( rate after deducting the scrap materials. ) . make l&t / abb / hpl / cg 4.08 cost towards supplying and fitting of 160a mccb, 3phase, 50hz, isi marked, with all labour tools , tackles and technician charges. with cp & ohc, ( rate after deducting the scrap materials. ) . make l&t / abb / hpl / cg 4.09 cost towards overhauling of motor control panel cum 3 nos. of f.a.s.d. starter panel with all labour tool, tackles and technician charges for disconnecting the electric line & opening of electric wire connection inside panel. cleaning, checking, rectifying of faults of 3nos. f.a.s.d. starter with supply and fitting of contacter set ( mnx95 1no and mnx50 1no. ) l&t make or equivalent capacity of isi marked reputed make, over load relay 1no., timer 1no., spp 1no. etc all complete work each for 3 nos. fasd starter, dressing and doing fresh electric connection with new wire and connector inside panel, rechecking of all connections and testing on full load. ( rate after deducting the cost of scrap materials ) . for mcp no. 1. 4.10 cost towards overhauling of motor control panel cum 2 nos. of f.a.s.d. starter panel with all labour tool, tackles and technician charges for disconnecting the electric line & opening of electric wire connection inside panel. cleaning, checking, rectifying of faults of 2nos. f.a.s.d. starter with supply and fitting of contacter set ( mnx70 1no and mnx50 1no. ) l&t make or equivalent capacity of isi marked reputed make, over load relay 1no., timer 1no., spp 1no. etc all complete work each for 2 nos. fasd starter, dressing and doing fresh electric connection with new wire and connector inside panel, rechecking of all connections and testing on full load. ( rate after deducting the cost of scrap materials ) . for mcp no. 2. 4.11 cost towards supplying and fitting of 40w led flood light, with bracket, copper wire, on off switch etc with all accessories including all labour tools , tackles and technician charges., with cp & ohc, ( rate after deducting the scrap materials. ) . make havells / syska / mescab / polycab / phillips 4.12 providing chipping work on the roof surface of clear water pump house, removing of all garbage to outside with lead of 50 m , providing and cleaning of concrete surface to remove dust and cement laitance by cleaning with compressed air & water jet including all materials, labour, tools complete. pounding test to be done after plugging all outlets and to be checked from soffit to identify seepage, leakage. on identification of seepage, cement grouting to be done with non shrink expanding admixture of sika lndia pvt.ltd. / myk schomberg / dr fixit / fosroc or equivalent. 4.13 cost towards providing pcc m 200 in nominal mix of 1:1.5:3 on roof with approved quality of stone chips 12mm to 6mm size graded and clean course sand of fm 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete as per building specification and direction of e / i. 4.14 providing 12 mm thick water proof cement plaster ( 1:3 ) with clean coarse sand of f m. 1.5 with integral water proofing compound liquid @125 ml per bag cement including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of e / i. brand fosroc conplast x421 lc, sika plastocrate plus, dr fixit pidiproof lw+, myk proof wp 10 or equivalent. 4.15 dismantling old plaster and pointing in cement or lime and taking out joints to 15mm. depth, watering and disposal of unserviceable materials with all leads all complete as per direction of e / i. inside and outside of pump house, 4.16 providing 6mm thick cement plaster ( 1:4 ) in ceiling and wall of building with clean coarse sand of f.m. 15 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of e / i. 4.17 providing two coats of snowcem of approved shade and make over old surface including washing cleaning and preparing the walls , scaffolding, curing and taxes all complete as per building specification and direction of e / i. 4.18 providing 2 ( two ) coats of synthetic enamel paint of approved shade & make over steel surface including cleaning the surface, removing dirt, scales, smokes, grease, scaffolding & taxes all complete as per building specification and direction of e / i. for door, window, common header pipe, valves etc....

Central Coalfields Limited - Jharkhand

32576370 repairing and overhauling of vertical turbine pump set, 1000 gpm, 07 stage, 140 mtr head installed at iwss / ccd unit of dhori area, m / c sl.no 1530791012 b ) . dismantling of motor, couplings, base frame, delivery pipe line connection, 07 stages...

Bharat Coking Coal Limited - Jharkhand

32571319 installation of 11kv 3point3kv 1000kva power transformer at muraidih river side for trouble free power supply to 3point3kv 1000gpm turbine pump motor set installed at river side sump near mocp filter plant and other miscellaneous electrical works of muraidih under amp colliery...

Central Coalfields Limited - Jharkhand

32338664 day to day running repairing & mechanical maintenance works for 16 nos. pumps along with associated motors of the following pump and making/fabricating column pipe of vertical turbine pumps installed at dhori (k) river side, ccd filter plant, singh nagar filter plant under administrative control of g.m. unit in respect of iwss/ccd, dhori area....

Central Coalfields Limited - Jharkhand

32242434 day to day running repairing and mechanical maintenance works for 16 nos. pumps along with associated motors of the following pump and making / fabricating column pipe of vertical turbine pumps installed at dhori ( k ) river side, ccd filter plant, singh ...

Drinking Water And Sanitation Department - Jharkhand

31943049 e quotation for seeking firm rates for non schedule items for preparing estimates. s / i / t / c of horizontal split casing centrifugal pump sets and associated works at gonda ( clear water ) 2 sets an s / i / t / c of vertical turbine pump sets with all associate works at gonda ( raw water ) pumping plant , supplying, installation, testing and commissioning of horizontal split casing centrifugal pump sets [ make kirloskar / jyoti / wpil / wilo mather & platt ] with ss / bronze impeller capable to discharge 454 m³ / h against a total head of 70 meters mounted on a common m.s. base plate and coupled with tefc ie3 type squirrelcage induction motor [ make kirloskar / crompton / abb / siemens ] operating on 3 phase, 50 hz, 415v+ 10% ac supply and having speed 1400 1500 rpm of suitable size i.e. bhp of motor is 10% above than that of pump set; including cost of supplying, fitting & fixing of all required accessories such as kirloskar / ivc / ivi make c.i.d.f. sluice valve, n.r. valve , foot valve of suitable size & length of ms suction pipe 20 ft and delivery main 20 ft as required etc. with required fittings like bends, short pieces, flanges & welding wherever needed including supplying, erecting, testing and commissioning of fully automatic star delta starter ( 200 hp ) suitable for above pump set of l&t / schneider / bch / siemens make including dismantling of existing pcc foundation & making new pcc foundation of required size providing all labours, materials, tools & tackles all complete as per e / i , supplying & laying 185 sq. mm 1.1 kv 3 core pvc sheathed and insulated copper cable of reputed make & isi marked from panel board to fasd starter. , supplying and laying 95 sq. mm, 1.1 kv grade, 3 core pvc sheathed and insulated copper cable of reputed make & isi marked from fasd starter to electric motor in bunch of two cable. , cost towards doing cable socketing with lugs of 70 sq. mm copper cable sockets. , supplying all materials, labours, tools & tackles for making chemical earthing station with electrodes and earth fill compound ( bfc ) etc. all complete as per ie rules. , cost towards providing and fixing 25 mm * 06 mm gi strip at 0.5 mt. below the ground as strip earth electrode including soldering from earring point tomotor and from motor to panel. , raw water pumping plant , supplying, installation, testing and commissioning of vt pump sets with 50 ft. suitable size m.s. column pipe assembly in random length of 5 ft. [ make kirloskar / jyoti / wpil / wilo mather & platt ] with ss / bronze impeller capable to discharge 682 m³ / h against a total head of 18.3 meters [ 150000 gph & 60 ft. ] coupled with vertical, solid shaft, tefc, ie3 type squirrelcage induction motor [ make kirloskar / crompton / abb / siemens ] operating on 3 phase, 50 hz, 415v+ 10% ac supply and having speed 1400 1500 rpm of suitable size i.e. bhp of motor is 10% above than that of pump set; including cost of supplying, fitting & fixing of all required accessories such as kirloskar / ivc / ivi make c.i.d.f. sluice valve, n.r. valve of suitable size & jointing it with the delivery header by supplying & fitting of the required bends, short pieces, flanges & welding wherever needed including supplying, erecting, testing and commissioning of fully automatic star delta starter ( 100 hp ) suitable for above pump set of l&t / schneider / bch / siemens make by providing all labours, materials, tools & tackles all complete as per e / i , supplying and laying 70 sq. mm , 1.1 kv grade, 3 core pvc sheathed and insulated copper cable of reputed make and isi marked from panel board to fasd starter , supplying & laying 50 sq. mm 1.1 kv grade, 3 core pvc sheathed and insulated copper cable of reputed make and isi marked from fasd starter to electric motor in bunch of two cable , cost towards doing cable socketing with lugs of 70 sq. mm and 50 sq. mm copper cable sockets. 18 ends for 1 set. , supplying all materials, labours, tools and tackles for making chemical earthing stations with electrodes and earth fill compound ( bfc ) etc. all complete as per ie rules, for 2 nos. p / sets , cost towards providing and fixing 25 mm * 6mm g.i. strip 0.5 mt. below ground as strip earths electrode including soldering from earthing point to motor panel & transformer. , providing supplying m.s. sheet having thickness 10 mm, transportation upto pump house of raw water plant, cutting in appropriate sizes at site by exact measurements of blank spaces between pump set to pump set after replacing the old, rusted & broken sheet, fitting the same on rail pool beam properly including all labours, tools & tackles all complete job. measurement of sheet: 3’ * 2’ 6 nos. & 2’ * 2’ 1 no. wt. of m.s. sheet = ( 40 * 0.093 ) m^2 * 0.01 m * 7870 kg / m^3 = 292.76kg. cost including transportation , cutting & laying all complete @ 127 / kg = 37180 / = 1 job...

Drinking Water And Sanitation Department - Jharkhand

31920359 e quotation for seeking firm rates for non schedule items for preparing estimates supplying, installation, testing and commissioning of horizontal split casing centrifugal pump sets and associated works at gonda (clear water) 2 sets & supplying installation, testing and commissioning of vertical turbine pump sets with all associate works at gonda (raw water) pumping plant 2 sets....

Drinking Water And Sanitation Department - Jharkhand

31910727 supplying, installation, testing and commissioning of horizontal split cassing centrifugal pump sets and associated works at gonda 2 sets and supplying, installation, testing and commissioning of vertical turbine pump sets with all associated works....